FIDIC银皮书(设计采购施工(EPC)合同条件-英文).doc

FIDIC银皮书(设计采购施工(EPC)合同条件-英文).doc

  1. 1、本文档共97页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
FIDIC合同银皮书

contents 1 General Provisions 1 1.1 Definitions 1 1.2 Interpretation 6 1.3 Communications 6 1.4 Law and Language 7 1.5 Priority of Documents 7 1.6 Contract Agreement 8 1.7 Assignment 8 1.8 Care and Supply of Documents 8 1.9 Confidentiality 8 1.10 Employer’s Use of Contractor’s Documents 9 1.11 Contractor’s Use of Employer’s Documents 9 1.12 Confidential Details 10 1.13 Compliance with Laws 10 1.14 Joint and Several Liability 10 2 The Employer 11 2.1 Right of Access to the Site 11 2.2 Permits, Licences or Approves 11 2.3 Employer’s personnel 12 2.4 Employer’s Financial Arrangements 12 2.5 Employer’s Claims 12 3 The Employer’s Administration 13 3.1 The Employer’s Representative 13 3.2 The Employer’s personnel 14 3.3 Delegated Persons 14 3.4 Instructions 15 3.5 Determinations 15 4 The Contractor 15 4.1 The Contractor’s General Obligations 15 4.2 Performance security 16 4.3 Contractor’s Representative 17 4.4subContractors 18 4.5 Nominated Subcontractors 18 4.6 Co-operation 19 4.7 Setting out 19 4.8 Safety procedures 20 4.9 Quality Assurance 20 4.10 Site Data 20 4.11 Suffciency of the Contract Price 21 4.12 Unforeseeable Difficulties 21 4.13 Rights of way and Facilities 21 4.14 Avoidance of Interference 21 4.15 Access Route 22 4.16 Transport of Goods 22 4.17 Contractor’s Equipment 23 4.18 Protection of the Environment 23 4.19 Electricity, Water and Gas 23 4.20 Employer’s Equipment and Free-Issue Material 24 4.21 Progress Reports 24 4.22 Security of the Site 26 4.23 Contractor’s Operations on Site 26 4.24 Fossils 26 5 Design 27 5.1 General Design Obligations 27 5.2 Contractor’s Documents 28 5.3 Contractor’s Undertaking 29 5.4 Technical Standards and Regulations 29 5.5 Training 30 5.6 As-Built Documents 30 5.7 Operation and Maintenance Manuals 31 5.8 design Error 31 6 Staff and Labour 31 6.1 Engagement of Staff and Labour 31 6.2 Rates of Wages and Conditions of Labour 31 6.3 Persons in the Service of Employer 32 6.4 Labour Laws 32 6.5 Working Hours 32 6.6 Facilities for S

文档评论(0)

almeida + 关注
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档