- 1、本文档共122页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
鲁班路转盘信号控制 * 国家精品课程:交通控制与管理 * * * 国家精品课程:交通控制与管理 学习动物精神 11、机智应变的猴子:工作的流程有时往往是一成不变的,新人的优势在于不了解既有的做法,而能创造出新的创意与点子。一味 地接受工作的交付, 只能学到工作方法 的皮毛,能思考应 变的人,才会学到 方法的精髓。 学习动物精神 12、善解人意的海豚:常常问自己:我是主管该怎么办才能有助于更好的处理事情的方法。在工作上善解人意, 会减轻主管、共 事者的负担,也 让你更具人缘。 * The TMC has responsibility for the whole state of New South Wales, not just the City of Sydney. SCATS is installed in cities on the border of NSW and Queensland at Tweed Heads approximately 1000kilometeres and also in Albury on the NSW Victoria border. SCATS is also installed in NSW country towns such as Orange, Coffs Harbour and Bathurst. The TMC can monitor and interface with all of these regional cities in the State. * * * * * * * * * * * Using data from nominated detectors at representative intersections, SCATS calculates every cycle: A recommended cycle time or RL. The current cycle time (CL) will move towards the RL if allowed (ie the CL may be LOCKED and cannot move). The change to CL is limited to prevent over-reaction. Usually it can move within the range of +/- 6 seconds (ie if CL is 82 and RL is 84, CL changes to 84). However, if a trend in excess of 6 seconds in one direction is established for 3 consecutive cycles, CL can change within the range of +/- 9 seconds. (ie if CL is 65 and RL is 100 seconds for 6 cycles, CL becomes 66, 72, 81, 90, 99, 100. Phase or STAGE times. These are contained in phase split plans which are defined by the traffic engineer (each intersection may have 1, 4 or 8 split plans). SCATS votes for a the split plan which would produce the most equalised saturation on each of the monitored approaches. Two methods are available for picking the plan with the best phase splits: Vote for the plan which would result in the lowest equalised saturation on all nominated approaches. If 2 votes for the same plan are produced in the last 3 cycles, SCATS copies the contents of that plan into the running plan. Using a table of changes to the running plan (increments and decrements withi
您可能关注的文档
最近下载
- 食堂食材配送采购 投标方案(技术方案).doc
- 《基于单片机的火灾报警系统设计》6800字.doc
- 《GB 31604.49-2023食品安全国家标准 食品接触材料及制品 多元素的测定和多元素迁移量的测定》.pdf
- 《船舶救生与消防》课件.ppt VIP
- 合肥市住宅小区物业服务等级标准.pdf
- 求职信写作教学课件.ppt
- GBT51313-2018电动汽车分散充电设施工程技术标准.doc
- 《第一单元复习》苏教版小学数学四年级下册(第八册)课件 (5).ppt
- 环境采样员培训.pptx VIP
- ABS 【2023】RULES FOR BUILDING AND CLASSING Mobile Offshore Units 移动式海上设备建造和入级规则。第5部分防火和安全。措施和特点.pdf
文档评论(0)