- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
《英文文件翻译案例基础设施建设计划和技术措施精诚翻译工作室
Construction Plan and Technical Measures
Section 1 Construction Preparation
(A) Organizational Preparation
Build engineering project managing department. Appoint someone who is equipped with sophisticated technology and rich engineering experience, and has corresponding project manager qualification as the project manager, at the same time, build a project team which consists of skilled construction and technical management personnel who have rich experience for preparation work. Select a construction team which is well organized, build material base and other temporary facilities.
(B) Preparation in construction site
Carry out unified planning after arrival, carefully erect temporary facilities and arrange electricity, water supply and drainage and fire fighting facilities for construction so as to facilitate smooth production.
(C) Labor force organization
1. Construction quality of our company is great, which is related to excellent teams employed by us. In this project, excellent construction, installation and coating personnel will be transferred from a few best teams to build a great construction team which is reasonably organized.
2. Before the commencement of construction, responsible person, technical staff, security staff and workers need to accept special energy-saving training, and construction personnel need to accept level-3 safety training.
(D) Materials preparation
Develop plans for all kinds of materials, components and equipment. Carry out inspection and maintenance for those materials, components and equipment and ensure that they are in standby condition.
(E) Construction equipment
1. Main construction machinery is the key to quick and timely completion of the project, therefore, we must fully take features of the project, advantages and characteristics or our company in machinery and equipment into consideration so as to meet the project’s construction demands.
2. Prepare temporary production facilities.
3. Erect materials base and machin
您可能关注的文档
- 《苏教版高中化学必修1专题3课时练习专题及答案.doc
- 《苏泊尔炊具项目建议书终.doc
- 网传iPhone7卖点曝光概念机出售.doc
- 《苏港万吨级码头结构设计英文翻译.doc
- 《苏湾镇农业产业化发展现状及发展对策12.doc
- 《苏科版七年级生物下复习资料.doc
- 《苏科版八上4.2位置的变化案例1.doc
- 网本拆解、改平板、加装触摸屏.doc
- 《苏锡常文化产业考察报告.doc
- 《苏锡常镇二模作文“留一点空间”写作指导1.doc
- 五年级数学上册5简易方程2解简易方程第8课时实际问题与方程3教学设计新人教版.doc
- 2024_2025学年新教材高中生物第2章细胞的结构和生命活动第3节第1课时细胞质膜具有选择透过性教案苏教版必修1.doc
- 江苏专用2025版高考地理一轮复习第十二章人类与地理环境的协调发展1人类与地理环境的协调练习含解析新人教版.doc
- 2024_2025学年高中化学第一章物质结构元素周期律第三节化学键练习含解析新人教版必修2.docx
- 2024_2025学年高中政治专题二君主立宪制和民主共和制:以英国和法国为例综合训练含解析新人教版选修3.docx
- 2024_2025学年高中生物课时分层作业18捕获光能的色素和结构含解析新人教版必修1.doc
- 2024_2025学年高中政治专题一古典政治经济学巨匠的理论遗产第3框李嘉图的理论贡献学案新人教版选修2.doc
- 2024_2025学年新教材高中生物第6章细胞的生命历程3细胞的衰老和死亡学案2新人教版必修1.doc
- 2024_2025学年新教材高中生物第6章生物的进化1生物有共同祖先的证据学案新人教版必修2.doc
- 司机保证书15篇 .pdf
文档评论(0)