mechanical o m manual- section4- operating procedures(机械o m手动-第四单元操作程序).docVIP

mechanical o m manual- section4- operating procedures(机械o m手动-第四单元操作程序).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
mechanicalo

OPERATING PROCEDURES 4-1 GENERAL 1 4-2 AUTOMATIC OPERATION 1 4-3 MANUFACTURERS RECOMMENDATIONS 1 4-4 OPERATION OF RAINWATER WATER SYSTEM 3 4-5 COLD WATER SYSTEMS - DRAINING DOWN 4 4-6 COLD WATER SYSTEMS - REFILLING 5 4-7 COLD WATER SYSTEMS - EMERGENCY PROCEDURES 6 4-7-1 Failure of the mains water supply 6 4-7-2 Water leaks 6 4-7-3 Booster Set Pump Failure 6 GENERAL The procedures in the following section are listed in the order in which they should be carried out. The whole of the procedure, including any referenced Health and Safety information, should be read prior to carrying them out. The building services have been generally designed for automatic operation, and are interdependent on each other and therefore, should not be treated in isolation in the normal operation of the building. AUTOMATIC OPERATION The Building Management system (BMS)/Automatic Control System enables safe, reliable, stable and accurate control and monitoring of each of the mechanical and associated electrical services installations. The Trend BMS system is a site wide system serving the following buildings: Energy Centre. Main Building. Once systems are running under the AUTO control mode, the main plant functions are under the control of the BMS. Packaged items of plant run under their respective integral controls. The central timed controls for all the equipment are controlled by the main BMS. The procedures describe controls and interlocks to each item of equipment but reference must be made to the Controls Manuals which describes the overall control of all plant, including any interlinks to other associated systems. The normal mode of control is to be automatic and unless a fault condition arises, only the routine checks listed in the following procedures, including any manufacturers, together with a regular programme of routine maintenance should be required. MANUFACTURERS RECOMMENDATIONS Where the following schedules refer to specific manufacturers operat

您可能关注的文档

文档评论(0)

bgl001 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档