燃油管路系统——m d安德森癌症中心.docVIP

燃油管路系统——m d安德森癌症中心.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
燃油管路系统——m d安德森癌症中心

SECTION 23 11 13 – fuel oil piping systems GENERAL RELATED DOCUMENTS Drawings and general provisions of the Contract, including General Conditions and Division 01 Specification Sections, apply to this Section. Specifications throughout all Divisions of the Project Manual are directly applicable to this Section, and this Section is directly applicable to them. summary Perform all Work required to provide and install fuel oil piping systems. Provide a complete integrated emergency fuel system for all diesel driven equipment as shown in the Contract Documents. This specification requires system coordination, equipment, installation guidance, programming, startup, training and fuel stabilization treatment to be the responsibility of a single specialized fuel system supplier. This specification section includes Contractor responsibility for all materials, labor, design, code compliance, permits, inspections, piping, specialty components, fuel leak detection, fuel monitoring, and control systems installation. The system shall be in accordance with design standards and shall be designed and built for reliability. Fuel equipment supplier shall be responsible for all field control wire and conduit associated with the fuel system to ensure a fully functional and coordinated system and maintain a single point of system responsibility. Equipment and related material included: Main fuel storage tank(s) and accessories Day tank(s) and accessories Fuel distribution pipe, valves and fittings including automatic tank selection valves and related controls Painting (primer) and above and below grade labels of pipe system Re-Fueling equipment, controls, alarms and related operations Fuel transfer and control from main tank(s) to Day tank(s) Fuel maintenance/filtration system Automatic Tank gauge level and leak monitoring system Fuel piping leak detection sensors and monitoring system Integrated control and monitoring. Control system interface with building management system. C

文档评论(0)

bgl001 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档