- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
safeuseofcranes-cranelift(25页)
Safe use of cranes
Site lifting plan
In accordance with BS7121
Introduction
Management of lifting operations
Selection and duties of personnel
Procedures and precautions
Slinging and handling of loads
Lifting equipment
Risk Assessment
Lifting Assessment
Schedule of common lifts
Record of lifting appliances and accessories
Crane Team appointment and certification
In order to provide a safe system of work and to ensure compliance with current legislation this site lifting plan has been developed and is to be implemented by every member of the crane team involved with this project.
Although not exhaustive the following regulations must be adhered to:
The Lifting Operations and Lifting Equipment Regulations 98 (LOLER)
The Provision and Use of Work Equipment Regulations 98 (PUWER)
The management of health and safety regulations 1999
It is vital that all lifting operations are properly planned by a competent person and that the plan is followed by everyone involved in the operation.
This plan is to be read by all team members involved in lifting operations; this must be done prior to any lifting being carried out.
It is essential that all team members are fully competent and certified to carry out their individual roles. (See section 13)
It is essential that all team members are confident that they can fulfil their duties especially when works may need to be carried out at height.
Safe system of work
Whether the lifting operations are repetitive or if they are a one off, a safe system of work must be established and followed for the operation to be both safe and successful.
In order to provide a safe system of work the following items are to be included in the lift plan / Assessment:
The selection of suitable cranes and work equipment must be carried out.
A crane team is to be employed who are fully trained and competent and who have had their roles and responsibilit
您可能关注的文档
- randallk-summitgeology(8页).doc
- rangeactivitiesbeforefiring-camplejeune.doc
- rashdecisions-emorydepartmentofpediatrics(13页).doc
- radarbasics-departments(25页).doc
- ratioanalysis.instructor'smanual-universityofconnecticut.doc
- reactionofmagnesiumwithhydrochloricacid-lingnerchem(12页).doc
- recommendationitu-rs.1257-3-analyticalmethodto.doc
- recommendationitu-rs.1512-measurementprocedurefor(15页).doc
- recommendationitu-rs.1512-measurementprocedurefor.doc
- referencespecificationssection1350-calrecycle(29页).doc
- safeworkingprocedure-unsw(7页).doc
- safeworkingprocedure-unsw.doc
- safeworkmethodstatements-rooftilingsydney(8页).doc
- safeworkmethodstatements-rooftilingsydney.doc
- samplequalityassurancesurveillanceplan-gsa(8页).doc
- sampleschemeofwork-ocr(37页).doc
- samplesciencefairintro-wikispaces(60页).doc
- samplesciencefairintro-wikispaces.doc
- samplespecificationforhighstraindynamictestingof(9页).doc
- samplespecificationsfornewhomes(28页).doc
文档评论(0)