总体降水方案(英文).
Method Statement forDewatering(M.S. –005–2.0)China Harbour Engineering Co. L.L.C.MS-0052.017/03/2009R.N.RevisionSubmit. DatePrepared ByChecked ByApproved ByGeneral Introduction of ConstructionGeneralReem Island Development Sectors 2 3 Shore Protection Works has a total length of more than 6000 meters. The scope of work includes:Block Type Wall Structure、Shore Protection Wall Structure、Beach Works、Webbed L-Shaped Wall Structure(-3.25m、-2.5m)and canal works。 The overall construction area is required to be divided into 9 sections, see as below:Picture 1 General Layout Excavation of each section:As per the above picture, construction area is divided into 9 sections:Section 1: Webbed L-Shaped Wall Structure with Channel Bed level of -3.5mGround level is 0.15-3.01m.Channel Bed excavation level is -2.5m; Level of excavation for foundation is -4.75m。Section 2:Webbed L-Shaped Wall Structure with Channel Bed level of -3.5mGround level is 2.6-2.9m,preliminary excavation level is 0.22-0.64m。Channel Bed exaction level is -3.25m;foundation excavation level is -4.75m。Section 3: Block structure with Cannel bed level of -3.25mGround level is 2.66-2.99m,preliminary excavation level is 0.05-0.67m。Channel Bed excavation level is -3.25m,foundation excavation level is -4.75m。Section 4:Webbed L-Shaped Wall Structure with Channel Bed level of -3.5mGround level is 2.44-2.81m,preliminary excavation level is 0.30-0.87m。Channel Bed excavation level is -3.25m,foundation excavation level is -4.75m。Section 5:Webbed L-Shaped Wall Structure with Channel Bed level of -2.5mGround level is 2.45-3.11m,preliminary excavation level is 0.43-0.95m。Channel Bed excavation level is -2.5m,foundation excavation level is -4m。Section 6:Webbed L-Shaped Wall Structure with Channel Bed level of -3.5m Ground level is 0.15-3.01m,preliminary excavation level is -2.11--2.78m。Channel Bed excavation level is -3.25m,foundation excavation level is -4.75m。Section 7:Webbed L-Shaped Wall Structure with Channel Bed level of -4
您可能关注的文档
- 怀孕1-10月注意事项..doc
- 快速消费品行业(FMCG)分销企业标准运作操作手册(下册)..doc
- 忻州市某国际大酒店装饰施工组织设计..doc
- 怀孕1-10月的注意事项..doc
- 忻州师院附中德育工作经验交流会材料..doc
- 怀孕准备及产后坐月子的方法..doc
- 怀孕初期注意事项大全..doc
- 怀孕40周全程手册(全本)..doc
- 怀孕女人注意事项..doc
- 怀孕完全知识手册..doc
- 数学六年级下册第三单元《解决问题的策略》单元复习精选题(一).pdf
- 威海市语文六年级下册期末复习试题(含答案).pdf
- 安徽省灵璧县重点名校2024年中考三模英语试题含答案.pdf
- 广东广州花都区2024年四年级英语第二学期期中联考试题含答案.pdf
- 机电一体化项目职业技能大赛试题(SX-815Q).pdf
- 小学数学《分数除法》50道应用题包含答案(审定版).pdf
- 生产经营单位安全培训考试题及参考答案(典型题).pdf
- 小学六年级数学日记10篇.pdf
- 山东省威海市文登市六年级(上)年末数学试卷(五四学制)(解析版).pdf
- 山西省吕梁市交城县2023-2024学年七年级上学期期中地理试卷(含答案).pdf
文档评论(0)