总体降水方案(英文).

Method Statement forDewatering(M.S. –005–2.0)China Harbour Engineering Co. L.L.C.MS-0052.017/03/2009R.N.RevisionSubmit. DatePrepared ByChecked ByApproved ByGeneral Introduction of ConstructionGeneralReem Island Development Sectors 2 3 Shore Protection Works has a total length of more than 6000 meters. The scope of work includes:Block Type Wall Structure、Shore Protection Wall Structure、Beach Works、Webbed L-Shaped Wall Structure(-3.25m、-2.5m)and canal works。 The overall construction area is required to be divided into 9 sections, see as below:Picture 1 General Layout Excavation of each section:As per the above picture, construction area is divided into 9 sections:Section 1: Webbed L-Shaped Wall Structure with Channel Bed level of -3.5mGround level is 0.15-3.01m.Channel Bed excavation level is -2.5m; Level of excavation for foundation is -4.75m。Section 2:Webbed L-Shaped Wall Structure with Channel Bed level of -3.5mGround level is 2.6-2.9m,preliminary excavation level is 0.22-0.64m。Channel Bed exaction level is -3.25m;foundation excavation level is -4.75m。Section 3: Block structure with Cannel bed level of -3.25mGround level is 2.66-2.99m,preliminary excavation level is 0.05-0.67m。Channel Bed excavation level is -3.25m,foundation excavation level is -4.75m。Section 4:Webbed L-Shaped Wall Structure with Channel Bed level of -3.5mGround level is 2.44-2.81m,preliminary excavation level is 0.30-0.87m。Channel Bed excavation level is -3.25m,foundation excavation level is -4.75m。Section 5:Webbed L-Shaped Wall Structure with Channel Bed level of -2.5mGround level is 2.45-3.11m,preliminary excavation level is 0.43-0.95m。Channel Bed excavation level is -2.5m,foundation excavation level is -4m。Section 6:Webbed L-Shaped Wall Structure with Channel Bed level of -3.5m Ground level is 0.15-3.01m,preliminary excavation level is -2.11--2.78m。Channel Bed excavation level is -3.25m,foundation excavation level is -4.75m。Section 7:Webbed L-Shaped Wall Structure with Channel Bed level of -4

文档评论(0)

s4as2gs2cI + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档