- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
appropriate assessment report(适当的评估报告)(6页)
Appropriate Assessment Report
Assessment of the likely effects of the installation of submarine electricity power cables between Moneypoint, Co. Clare and Glencloosagh Bay, Co. Kerry on the integrity of the Lower River Shannon SAC and River Shannon and River Fergus SPA
Project Description:
As part of the ongoing national transmission reinforcement project Eirgrid propose to develop 2 High Voltage submarine electricity circuits crossing the Shannon estuary connecting the transmission system at the Moneypoint Generation Station in Co. Clare to the transmission system adjacent to Glencloosagh Bay in Co. Kerry along the route shown on Drawing No. 231538 02E 033 submitted by Eirgrid. Each circuit would comprise of 4 cables, 3 operational and one spare phase. It is proposed that 1 cable circuit would be operated at 220kV and be installed in 2013. A second circuit would be operated at 440kV and it is intended that this would be installed in 2014.
The proposed cable route across the foreshore is approximately 2.8 Km long and the deepest point along the route is approximately 60m. The total area of foreshore within the cable corridor would be 51.23 hectares. The cables will be installed using a post-lay burial water jetting system and it is intended to bury the cable along the proposed route to a preferred depth of 1.5m below the seabed where the seabed conditions and local geology allows. Where burial is not possible the cable would be placed on the seabed and protected using rock armour or cable mattresses. Each cable would be placed in a separate trench 20 - 25m from one another. The cables will be brought ashore, across the intertidal zone, in 8 individual trenches and will be connected to a terrestrial cable circuit at 2 No. individual jointing bays situated above the high water mark, one at each landfall site, as shown on Drawing No. 231538 02E 030.
In the intertidal area the cable trench would be approximately 0.6 wide and 1 – 1.5m deep. Cable laying
您可能关注的文档
- activity i e a t product promotion2007(活动我promotion2007 e t产品)(56页).doc
- acu math900- r e k e n i n s t r u m e n t e n(acu math900 k - r e e n i n s t r u m e n t e n)(1页).doc
- acupuncture treatmentfor chronic low back pain a case study(针灸treatmentfor慢性下腰痛的案例研究)(13页).doc
- acton fishingin iceland's exclusive fishing zone(阿克顿fishingin冰岛的独家捕鱼区)(12页).doc
- adelaide,thecapitalcityof south australia,isthekeyto(thecapitalcityof南澳大利亚阿德莱德,isthekeyto)(10页).doc
- admin order template- r a f(管理模板- r f)(8页).doc
- additionalsuiteof m p asearchlocations-4thnational m p a(additionalsuiteof m p asearchlocations-4thnational m p)(57页).doc
- admiralty outline- g w s b a(海军- g w s b一个轮廓)(51页).doc
- adssite-horshamdistrictldf(9页).doc
- advanced p c bdesignandlayoutfor e m c-ee(先进的p c bdesignandlayoutfor e m c-ee)(293页).doc
- area- weighted average solar heat gain coefficient(面积加权平均太阳能热量增益系数)(8页).doc
- areyousuprised-wirelessplanningandcoordinationwing(30页).doc
- arterial blood gas sampling( a b g)(动脉血液气体采样(b g))(6页).doc
- aslongastherehavebeenphonelines,therehavebeen(aslongastherehavebeenphonelines,therehavebeen)(48页).doc
- asia- pacific forumon telecommunications policyand regulation(亚洲-太平洋forumon电信政策和监管)(30页).doc
- assessing vital functions accurately(准确评估的重要功能)(105页).doc
- astudyofenvironmentalfactorsthatinfluenceseagrass(37页).doc
- attachment a student geography noteson russiaand central asia(附件一个学生地理noteson俄罗斯和中亚)(5页).doc
- attachment b- s a r p s a m e n d m e n t p r o p o s a l s f o r i c a o a i p(附件b - s r p s m e n d m e n t p r o p o s l s f o r我c一个o p)(56页).doc
- audit tool05-05- san bernardino county(审计tool05-05 -圣贝纳迪诺县)(7页).doc
文档评论(0)