- 1、本文档共36页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
VMware_SRM容灾方案解析
* * NOTE: This slide has animation Testing of a SRM Recovery Plan can be completed without impacting the protected VMs (app_vm7 to app_vm12) at the protected site SRM recovery plan called ‘Recovery Plan 2 – Protection Group 2’ required to complete a partial site failover for the local data center vim22dc which is protected by SRM The protected VMs that will be failed over are app_vm7 through to app_vm12 from Protection Group 2 which is associated to the datastore group shared-san-2 While the simulated failover test is running, the status of each step that makes up the recovery plan can be monitored by going to Recovery Steps tab in the VI Client which will inform you what steps are currently Running as well as what steps were completed with a Success status. It is worth pointing out that there are some steps in a recovery plan that will only be executed during a simulated test, these steps are identified by ‘Test Only’ under the Mode column, there are also some steps that will only be executed during an actual failover, these steps are identified by ‘Recovery only’ under the Mode column Once the simulated failover test is completes a report of the test run can be viewed from the History Tab. The report can be viewed by clicking on the ‘view’ link. The report contains a list of all the steps in the recovery plan along with a status of ‘success or error’ and the duration of each step in the recovery plan * * SRM enables you to ‘Run’ a recovery plan which will result in the actual failover of virtual machines from the protected site The failover process via SRM is rapid, repeatable, reliable, manageable and auditable There are two ways to initiate the actual failover, you can either click on the ‘Run’ button or click on the ‘Execute Recovery Plan’ link under the Commands section If there is still connectivity back to the protected site at the time the disaster is declared by the business, SRM will first initiate the power down of the protected VMs at the protecte
您可能关注的文档
最近下载
- 【小学】中小学校长(园长)最新版财务人员培训试卷.docx
- 甄嬛传之滴血认亲剧本PPT.pptx
- 基于STM32的智能拐杖设计.doc
- 2023年机械工程测试技术期末试题库汇总全面.doc VIP
- 2025年中国兽用生物制品行业发展前景及投资战略咨询报告.docx
- 国家安全监管总局关于发布金属非金属矿山禁止使用的设备及工艺目录第一二批.pdf VIP
- 甄嬛传英文剧本.docx
- 废旧铅酸蓄电池绿色处理成套设备可行性研究报告建议书.docx
- 儿童早期预警评分系统(Pediatric early warning system,PEWS)评分标准(Brighton).docx
- 长沙市轨道交通4号线普瑞大道站地连墙施工方案.doc VIP
文档评论(0)