km-90awatthourmetertestsystem-knoppinc.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
km-90awatthourmetertestsystem-knoppinc

KM-90A WATTHOUR METER TEST SYSTEM Functional Description and Specifications A. General The test system shall: include a built-in analyzer/counter dedicated to the purpose of testing watthour meter parameters; allow test sequence setup from an operator programmable menu; provide a semi-automatic testing mode wherein the Full Load, Power Factor, and Light Load tests on a meter are performed automatically, without operator intervention; allow set up by form switch and front panel patch leads; allow closed-link testing of single-phase and polyphase meters; provide overall system accuracy of ±0.1% at unity and 50% power factor; use a pneumatically (air) operated test socket which remains closed upon loss of power or air. B. Test Requirements 1. Tests Performed a. Watthour As Found and As Left results shall be stored separately. Each can be separately recalled to the display, printed out, or sent to a computer or other peripheral device via an RS-232 port (or parallel port). b. KYZ (Pulse Initiators) Pulse initiator testing can be performed in either the pulses or revolutions mode. Pulses/revolution and its reciprocal shall be calculated and displayed. Additionally, KY and KZ counts shall be displayed. c. Demand Meter Testing Demand testing shall be done by either a time interval (0.1 to 99.9 minutes) or by a number of watthours (as measured by the watthour standard). The unit shall display the average KW applied, the disk revolutions, measured watthours, and the time of the test to the nearest tenth of a minute. d. Creep The system shall allow application of test voltage (without test current) for creep testing. e. Reference Standard The system shall be capable of testing external pulse producing standards (open collector output). 2. Meters Tested The system shall test all socket base meters–ANSI (American National Standards Institute) forms 1 through 16 (excluding 11), 19, 20, 21, 24, 26, and 29. Al

您可能关注的文档

文档评论(0)

heti94575 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档