ppt课件-current situation- juande fuca cable project(现状,胡安德fuca电缆项目).pptVIP

ppt课件-current situation- juande fuca cable project(现状,胡安德fuca电缆项目).ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Presentation Overview Introduction Need for Project Project Description Environmental Considerations Permitting Introduction Sea Breeze Pacific Juan de Fuca Cable, LP (“Sea Breeze Pacific”) is proposing to construct and have operated a 550 MW High Voltage Direct Current (“HVDC”) Light? transmission line between Port Angeles, Washington State, and the Greater Victoria Area, B.C. Project Proponent and Team Sea Breeze Pacific Juan de Fuca Cable, LP is a joint venture between Sea Breeze Power Corp., and Boundless Energy, LLC. Need for the Project Opportunities to strengthen B.C. and Washington transmission grids and improve voltage stability Consideration of short-term and long-term power generation, supply and load demand conditions Open Season, in which utilities will competitively bid to use the line, will ultimately demonstrate need Power Situation in the Pacific Northwest BC has high generation potential Many opportunities for electricity interchange Potential energy for transmission: More than 7000 MW in coastal B.C. 2000 MW in northern Alberta HVDC Light? Technology A proven, state-of-the-art technology with low environmental impact and no fluctuating electro-magnetic field (EMF) Relatively low operating temperature, and non-liquid insulation Environmental Considerations Environmental Studies and Consultation Expected Timeline 1. Terrestrial field studies: - Start June 2005; completion anticipated July 2005 Marine field studies: Start June 2005; completion anticipated August 2005 3. Permitting: Start September 2004; completion anticipated March 2006 4. Operational: The physical construction phase is expected to begin November 2006 and be completed by November 2007. Permitting Final National Energy Board application is expected to be filed October 2005 and will include information to meet Canadian Environmental Assessment Act requirements. No Provincial permits required. Municipal permits will follow federal permit approvals. Thank you Presented by: Se

您可能关注的文档

文档评论(0)

heti94575 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档