ppt课件-i e2030 lecture5 project management drawing gantt charts(我e2030 lecture5项目管理绘制甘特图).pptVIP

ppt课件-i e2030 lecture5 project management drawing gantt charts(我e2030 lecture5项目管理绘制甘特图).ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
IE 2030 Lecture 5: Project Management Drawing Gantt Charts Time on horizontal axis, Activities on vertical axis. 1 bar per activity Length of bar = required activity time Left end of bar at ES=Earliest Start Time Concepts: Slack Time Earliest Start Time IE 2030 Lecture 5: Gantt Charts IE 2030 Lecture 5: Gantt Charts Gantt Chart Pros and Cons Easy to understand, visual Can show how large a staff is needed Good for small projects Poor at showing precedence relations Poor at showing ``practical’’ slack Doesn’t deal with variability or uncertainty IE 2030 Lecture 5: PERT/CPM How to draw PERT/CPM networks Concepts: Critical Path, Early Time, Late Time How to compute values. Why a good algorithmic method is needed. A model for dealing with uncertainty: PERT, Beta distribution, central limit theorem. Formulas that make assumptions. IE 2030 Lecture 5: PERT/CPM How to Draw Networks Each activity is represented by a unique arc (branch) Start node, Finish node Parallel arcs not permitted: 2 arcs may not share both head and tail nodes Use dummy arcs as needed for precedence Nodes may be thought of as events such as the end of an activity * * Slack time example 2 2 5 The first 2-time-unit activity has slack 0, and the second has a slack of 1. Either (but not both) could be delayed without delaying the project A D B E C F 4 9 8 12 10 7 2 Critical Path: A,D,F. Early start time of D,F = Late time = 12 Early start time of B,C = 4; Late start time=5 A D B E C F 4 10 8 12 10 7 3 Critical Paths: A,D,F; A,B,C,F; A,D,E,F. *

您可能关注的文档

文档评论(0)

heti94575 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档