- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
软件项目管理案例分析[精选]
IT项目管理案例分析 The GPS Auto-navigation System Verification Project
戴小卫 9/25/2010
REQUIREMENT 1: Project Organization
You quickly began assembling the project planning team. The team would have responsibility for: (1) developing the project plan and schedule, (2) conducting the reliability testing of the guidance systems, (3) conducting the tear down audit and interpreting the results, and (4) reporting the results of the project to Senior Management.
This is your project. Your project team consists of Gail YU, Manager of Quality Engineering, Tom HUANG, Manager of Design and Product Engineering, Jesse LIU, a senior engineer from Product Manufacturing, and Pete DONG, a senior engineer from Administration responsible for component purchasing and incoming testing of materials. Each member of your project team has access to whatever resources they need to support the project. This is a top priority for the company and you have been assured that you will “get whatever you need to complete the project”.
You decide that a first order of business is to develop a Project Charter. You will have an initial meeting in one day with the project management team. This is where you will develop the project objectives, roles, and responsibilities. You decide to go in with a draft and have the team work from there.
In preparation for this meeting,
(a) develop an initial project charter,
项目名称:导航系统可靠性测试及模块分解审计
项目起始时间:2010-9-1 项目结束时间:2010-9-27
项目目标:通过对5套导航系统的可靠性测试和模块审计,分别从工艺评估和工程设计分析 去判断那些工艺上的缺陷对产品的影响。通过测试结果的说明去说服客户公司的产品设计和实现是可靠可信的。
项目经理:Da i xiaowei Reliability Engineering Manager
项目成员:Gail YU, Manager of Quality Engineering
Tom HUANG,Manager of Design and Product Engineering
Jesse LIU,senior engineer from Product Manufacturing
Pete DONG,senior engineer from Administration responsible for component purchasing and incoming testing of materials
项目进程安排:1. 设计测试计划和时间安排
2. 实施导航系统可靠性测试
3. 实施模块分解审计,说明审计结果
4. 分析测
您可能关注的文档
最近下载
- 2023年阳江市社区工作者招聘考试真题 .pdf VIP
- 《高效课堂和有效教学模式研究》结题报告材料.pdf VIP
- 生猪、牛、羊、鸡、鸭、鹅屠宰HACCP计划模式表.pdf VIP
- 2024-2025学年广西壮族自治区小升初英语真题(含答案).pdf VIP
- 环保项目设备供货及服务保障措施.docx VIP
- 初中物理每日默写知识点(1)_Decrypted.pdf VIP
- 人教版信息科技四年级《多彩的数字世界》教学PPT课件.pptx VIP
- 我的幸福大家庭.pptx VIP
- 安全教育开学第一课主题班会PPT课件.pptx VIP
- (2025秋新版)人教版数学二年级上册教学计划.docx VIP
文档评论(0)