摘要 为满足经济发展的需要,根据有关单位的决定修建1座110KV盐北变电所。 本工程初步设计内容包含变电所电气设计,新建的盐北变电所从110KV侧东郊变电所受电,其负荷分为35KV和10KV两个电压等级。 通过技术和经济比较,现采用下列方案: 内设两台三绕组变压器,电压等级为121/37.8/11。 110KV进线采用内桥接线形式。 本工程初步设计内容包括变电所电气设计。 35KV和10KV配电装置同样采用单母线分段接线。 所用电分别从10KV两端母线获得。 关键词: 变电所 主变压器 潮流计算 短路计算 设备选型 SUMMARY For satisfying the demand that economy development, the authorities concerned decide to construct a YanBei transformer substation. This engineering first step design contents includes the transformer substation of electric Design. The new-et up salt a YanBei transformer substation obtain power form Dong Jiao substation (110KV) . There are two kinds of local loads in the substation,. One is 35KV,the other is 10KV. Pass the technique to compare with the economy, adopt the following scheme now: There are two three-winding transformers in the substation. Voltage grade adopt 121KV 38.5KV and 11KV. For 110KV main electrical connections shall adopt inside bridge connection. The 110KVenters the line 2 return, The adoption builds trolley wire. For 35KV and 10KV main electrical connections employ single sectionalized bus. Auxiliary power system get power form the 10KV sectionalized bus. Key phrase: Change to give or get an electric shock Main transformer Current calculation Short circuit calculation The equipments choose the type 目录 第一章: 原始资料分析 第五页 第二章: 110KV盐北变电所接入系统设计 第七页 第三章: 110KV盐北变电所地方供电系统设计 第九页 第四章: 110KV盐北变电所主变选择 第十九页 第五章: 所用变选择 第二十九页 第六章: 主接线设计 第三十 页 第七章: 主接线设计 第三十三页 第八章: 变电所电气设备选择 第四十五页 第九章: 继电保护配置 第七十 页 110KV盐北变电所设计说明书 根据河海大学《电气工程及其自动化》专业(函授)毕业设计任务书的要求,设计110KV盐北变电所。 110KV盐北变电所,采用双回110KV线路接入系统。35KV、10KV配电线路均采用双回线供电。 110KV采用内桥接线,安装两台SFPSZ9-75000/110三相三线圈变压器。35KV、10KV母线采用单母线分段接线。

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档