Production installation of cable terminals and connectors 7.8.5.2.1 construction preparation 7.8.5.2.1.1 technical preparation (1) check the cable accessory parts and materials should be installed with the cable. (2) check the installation tools, should be complete, intact. (3) is installed between cable accessories should be to test whether the cable be affected with damp be affected with damp, if damaged, inspection method is as follows: with shaking table test each phase of the cable core insulation resistance, 1 kv and below cable should be no less than 100 m Ω, 6 kv and above cable should be no less than 200 m Ω. Or do dc leakage current withstand voltage test. 7.8.5.2.1.2 operation conditions (1) has a wide operation site, construction site clean, and equipped with 220 v ac power. (2) in the workplaces where environmental temperature above 0 ℃, relative humidity below 70%, it is strictly prohibited in the rain, snow, wind weather construction. (3) aerial work should build a good platform, over the construction site set up tents, prevent dust intrusion. (4) transformer, high and low voltage switchgear, cables are installed, cable insulation. 7.8.5.2.2 construction technology (1) the dry bag type crosslinked xlpe power cable terminal head of production process. 1) equipment point check: material is in line with the number on the packing list, the postal inspection appearance presence of abnormal phenomenon, according to the sequence of operation is put in the big plate. 2) the insulation of the cable telemetry: open the cable seal, with 2500 v shake table test qualified rear can into the next process. 3) the stripping cable sheath. A. shell outer sheath: use clamp to fix cable vertical, measuring 750 mm to the cable port (indoor head measuring 550 mm), remove outer sheath. B. peel armoring: from outer sheath fracture measuring 30 mm armoring, tighten with a lead wire, the rest of the strip. C. peel inside cushion: from the amount of armoured fracture within 20 m

文档评论(0)

taotao0b + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档