WECaeroMaster2.5MW风力发电机.docVIP

  • 14
  • 0
  • 约1.45万字
  • 约 28页
  • 2017-02-17 发布于北京
  • 举报
WECaeroMaster2.5MW风力发电机 1 General (总论) The usage of a well-equipped workshop and work site is an essential precondition for the professional and successful assembly of wind turbines. (风电机组装各种工具是风机工作过程中必不可少的工具) This is a universal tool list for the assembly workshop and the work site for prototypes of the wind turbine. In this list, you will find necessary tools and devices. For a serial assembly more tools and additional tools are necessary. (这些工具集合了风机装配过程中所需要的各种工具,是风机总装过程中不可缺少的) 1.1 Requirements for the execution of assembly (风机装配的要求) The usage of a well-equipped workshop is an essential pre

文档评论(0)

1亿VIP精品文档

相关文档