- 1、本文档共32页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Pavement Type Selection – Updated Guidance on Use 路面类型选择的使用指南
Pavement Type Selection – Updated Guidance on Use of Alternate Bidding
Virginia Concrete Conference
Richmond, VA
March 6, 2014
Session Outline
2
Background on FHWA Policy Guidance Information
Federal Register Oct 8, 1981 PTS Policy
If designs equivalent then alternate bidding permitted
Federal Register Nov 9, 1981 Clarification
Discourages use of price adjustment clauses w/ AB
23 CFR, Part 626 Non-Regulatory Supplement April 8, 1999
FHWA does not encourage use of AB for PTS due to issue of equivalent pavement designs
3
Background on FHWA Policy Guidance Information
FHWA Memo Nov 13, 2008
Clarifies consolidates FHWA policy
AB is not encouraged
Use of commodity price adjustments should not be used
SEP 14 approval needed if using price adjustments
NCHRP Report 703 – Guide for Pavement Type Selection March 2011
4
PTS Method #1
PTS Method #2 (MI)
PTS Method #3
PTS Method #4
Components of Agency Processes
Selection of alternatives
Structural design
Economic Analysis
Primary/Secondary Factors
Contractor-based processes
Alternate Bidding
Design Build
Long Term Warranty
Other ( PPP, Value Engineering, BV Contracting, Contract Maintenance)
Overview of Pavement Type Selection
State Usage
10
Technical Advisory
Use of Alternate Bidding for Pavement Type Selection, T 5040.39 December 20, 2012
Elimination of SEP 14 approval for price adjustments, November 8, 2012
11
Question 1 Purpose of TA
Guidance on use of AB for PTS on Federal-aid projects on NHS
12
Question 2 Does TA Supersede other Guidance
TA Supersedes:
Federal Register FHWA PTS Policy Statement 11/9/81
23 CFR 626 NR Supplement issued 4/8/99
HIPT Memorandum issued 11/13/08
13
Question 3 Background on AB for PTS
Risk associated w/ material costs and performance
23 CFR 626 NR Guidance did not encourage use of AB
Limited use due to:
lack of national guidance,
consistent approach to AB and
open competitive bidding environment
14
Question 4 Scope/Applicability of TA
Recommended practice for use on FA projects on N
您可能关注的文档
- Orckestra PrsentationModle Franaisorckestra 公关233自我介绍MOD和232法国231AIS.ppt
- Oral Hygiene Instructions, Smoking Cessation Advice, 口腔卫生指导戒烟建议.pptx
- Oral Presentation ut口头报告UT.ppt
- Orbital excitation of the Giant planets its relation to 巨行星的轨道激发及其关系.ppt
- Order of Operations Texas Collaborative业务订单德克萨斯合作.ppt
- Ordinal Cheap Talk Kelley School of Business序号廉价交谈凯利商学院.ppt
- Ordered Sets in the Calculus of Data Structures数据结构演算中的有序集合.pptx
- Ordinary Gravity from Conformal Gravity普通重力由保角重力.ppt
- Ordonnance carabinskb配置 carabinskb.free.fr.ppt
- Organ Doctor Primary Resources器官医生主要资源.ppt
文档评论(0)