Requirements for the MOB Mars Habitat对暴徒的要求.pptVIP

Requirements for the MOB Mars Habitat对暴徒的要求.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Requirements for the MOB Mars Habitat对暴徒的要求

Mars or Bust Preliminary Design Review 12/8/03 Mission Description Based on the Design Reference Mission from NASA (Hoffman and Kaplan, 1997; Drake, 1998) Modified to narrow scope of project Key Assumptions for Design Only first uncrewed Habitat Focusing on surface operations Launch, transit, Mars entry not designed Interfaces with external equipment Rovers, power supply, ISRU unit Crew will use Habitat on arrival Overall Project Goal Establish a Martian Habitat capable of supporting humans Overall - Level 1 Requirements Support crew of 6 Support 600 day stay without re-supply Maintain health and safety of crew Minimize dependency on Earth Launch and Deployment Requirements 80 metric ton launch vehicle Recommended Total Habitat Mass 34,000 kg (includes payload) Deploys 2 years before first crew Land, deploy, operate, maintain all systems Setup and check-out before crew arrives Standby mode for 10 months between crews Operational lifetime of greater than 15 years Redundancy Requirements Mission critical: 2-level redundancy Life critical: 3-level redundancy Auto fault detection and correction Modular Easily repairable Electronic and mechanical equipment Highly autonomous Self-maintained or crew maintained If possible self-repairing All systems in Habitat must have low failure rates Operations Requirements Gather information about Mars Ease of learning System similarity Common software and hardware Real time science activity planning Integrate In-Situ Resource Utilization System Mission Architecture Systems Engineering and Integration Structures Command, Control, and Communications (C3) Power Distribution and Allocation Environment Control and Life Support Systems (ECLSS) Mission Operations and Crew Accommodations Automation and Robotic Interfaces Extra Vehicular Activity Systems (EVAS) Thermal Control In-situ Resource Utilization Unit (ISRU) and Mars Environment Organizational Chart Systems Engineering and Integration Team Primary: Juniper Jairala Tim Lloy

您可能关注的文档

文档评论(0)

118books + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档