化工过程模拟与分析(十控制系统建模简介).ppt

化工过程模拟与分析(十控制系统建模简介).ppt

  1. 1、本文档共39页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
化工过程模拟与分析(十控制系统建模简介)

10.6 Integrator: pumped outlet tank To be strict about placing above equation in standard form, we should define a gain and a time constant The response to a step change of magnitude Δw in inlet flow at time td is Summary of disturbance responses Initial condition is zero; disturbance is introduced at time td 10.7 Multiple system inputs from multiple inlet streams Consider a well-stirred tank heated by an electric resistance element of output power Q. Tref is a reference temperature for computing the enthalpy of the flowing stream Presuming that flow F is constant and the physical properties are not a function of temperature Steady state * 第十章 过程控制系统建模简介 主要内容 为何化工生产过程需要控制? 储液罐液面高度的控制; 过程控制的基本概念; 储液罐动态系统; 一些数学概念; 一阶动态系统的响应。 Why use surge tank? 齐鲁石化氯碱厂DCS界面 Stream wi has some steady design flowrate, but in practice it varies, causing problems in process 2. Propagation of disturbances between processes is a common problem, and a common solution is the surge tank. 10.1 Designing the tank Steps Characterizing the inlet stream Specifying limits on the outlet stream Making a suitable process model to connect inlet with outlet (1)Inlet: suppose that the flow swings by ±40% over a 20-minute period, flow is in kg/ h and time in minutes. (2) Outlet: the desired flow wo is 10,000 kg/h. Lets be hard-nosed and insist on no variation. (3) Process model: by instinct a chemical engineer writes a material balance. height is in m, area in m^2, time in minutes, and density in kg/m^3. Protect the tank It seems possible that the tank may overflow or run dry Suppose the simple case of wi ? wo = C Therefore, we should protect our tank with some automatic process control – something that will measure the level and take corrective action should the level become too high or low. 10.2 Definitions in process control process: the equipment within some boundary, along with the streams of matter and energy that cross that boundary -- what we usually mean when we think o

文档评论(0)

taotao0c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档