基建矿井开拓初步设计说明书——山西讲述.doc

基建矿井开拓初步设计说明书——山西讲述.doc

  1. 1、本文档共161页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
XXXX大学本科学生毕业设计(论文) 山西阳煤集团新元煤炭有限责任公司 年产400万吨新井初步设计 学 生: 学 号:指导教师: 姚 精 明 专 业: 采矿工程 XXXX大学资源及环境科学学院 二〇一〇年六月 Graduation Design(Thesis) of Chongqing University Preliminary Design(4000kt/a)for The Xinyuan Coal Limited Liability Company of Yangquan Coal Group in Shanx Undergraduate:Yao Junwei Supervisor:Yao Jingming Major:Mining Engineering College of Resources and Environmental Science Chongqing University June 2010 摘 要 本设计通过详细介绍公司的井田概况和地质特征,经过一系列的方案论证比较,选择了适合本矿井的开拓方式、采煤方法和各生产系统。井田内地质构造比较简单,走向较长,西翼为纵贯井田南北的草沟背斜,属于高瓦斯矿井,煤尘有爆炸危险;本井田主要有两层可采煤层,按埋藏深度从浅到深分别为号、号煤层,平均厚度分别为2.77m、3.32m,煤层倾角5o~9o,平均6o,属于近水平煤层。经过技术经济比较,煤矿设计生产能力为400万t/a,服务年限为76.6年,对第一水平选择了立井开拓方案,首采区的采煤方法采用倾斜长壁采煤法,综合机械化回采工艺。辅助运输系统与主运输系统相分离,其中主运输系统采用胶带运输、立井箕斗提升煤炭,辅助运输系统采用蓄电池机车运输,可满足人员、机械设备、材料和矸石的运输,无需中间转载,可从井底车场直达工作面。矿井一水平前期采用中央并列式通风,后期采用分区式通风系统。 总之,通过技术经济等多方面的比较得出本设计的开拓方案、采煤方法等均能满足矿井的开采需求。 关键词:立井开拓条带式倾斜长壁采煤法综合机械化采煤中央并列式通风 ABSTRACT This design introduces coalfield’s genneral situation and geologic characteristic of Xinyuan Coal Limited Liability Company of Yangquan Coal Group in detail. Based on a series of technique and economy comparisons, the suitable mine development scheme,mining method, mine’s (working area’s) openings and each main production system have been determined. The geologic structure in the coalield is simple,the main structure is Caogou Anticline acrossed the field from south to north. The mine has high gas and danger of coal-dust explosion. The designed main coal seams have two layers, including 3# coal seam and 4# coal seam from shallow to deep. Their average thickness is 2.77m and 3.32m respectively. Their angle of dip is 5o~9o, the average is 6o, so they belong to flat seams.The designed capacity of the mine is 4 million t/a and the expected life of the mine is 76.6 years. Based on technique and economy comprisions, the design chooses vertical shaft development for the first level, adopts long wall mining method along the dip and comprehensive

文档评论(0)

jiayou10 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8133070117000003

1亿VIP精品文档

相关文档