- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
NPI_Quanta_ 0520 soirna
Joint Lenovo-Quanta NPI Process WorkshopImprovements follow upIntroductionQuanta-Lenovo NPI role and cooperative functions RRQuanta cooperative functions participants RRProject development processQuanta NPI RRLenovo NPI/MPM Role Cooperative functions Lenovo NPI KPI is to:Common across TPG’s BU(DT,NB,SV, WS) SS attainment Smart GA attainment Measurement:Target =POR SS/SGA+/-7daysTrack days of delay from SS/SGA targetQuanta NPI vs. Lenovo MPMQuanta NPI Cross-function Teams Interface- Quanta NPI will coordinate cross functions for data collecting and request other functions to come out with data reports. Quanta NPI team will schedule internal meetings before Lenovo check-point meetings and make sure issues are well in place to highlight. Each of Quanta related functions will attend and present at the meetings with Lenovo, which will be well controlled by Quanta NPI.Cooperative functions participants RRRD/PM – technical issues and status updateNPI – overall assessment for issues and project coordinationMPM – manufacturing production issues and status update, manufacturing SMT FA capacity and technical/quality issues on production line status updateQM – quality issues and status updateProcurement (EE ME) – vendor supply commit update and tooling supply yield rate updateSales Operation Planning – supply commit and build to order status; DOI managementNPI Project DevelopmentLenovoQuantaSIT Exit/SVT Entry transaction SIV/SITSVTSOVPMPLenovo DevelopmentHMM ? LLLenovo NPI/MPMLM ?HHHQuanta RDHMM ?LLQuanta NPI/MPMLM ?HHHNote: “H” is leading and involving more.Quanta NPI RRRR:Co-work with cross function team to hold the key review meetings (EPR, MDRR, MRR and weekly base review meeting)Keep key milestones success for SVT, SOVP and SSMeasurement:POR Target dayMitigation plan tracking for schedule timelySVT SVT KPI: MDRR completion, SVT complete and ExitSVT review checkpoints:SVT Build Config and Quantity ReleaseSVT BOM ReadinessSVT Materials Preparation (all parts in) and r
您可能关注的文档
- how to improve EQ.ppt
- How to Stormproof Your Home.ppt
- how-to-design-the-best-tiltle.ppt
- Hudson River and GE.ppt
- Hydrocortisone Therapy for Patients with Septic shock.ppt
- If You Were Coming in the Fall 爱米莉·狄金森.ppt
- Informationsveranstaltung für die Fischzüchter & Fischhalter der Urkantone.ppt
- Insulin Therapy in the Inpatient and Outpatient Setting.ppt
- In the village.ppt
- Introduction to AllChinaData Terminal v1.0.pptx
最近下载
- 专题13.4 线段的垂直平分线的判定与性质【九大题型】(举一反三)(人教版)(原卷版).docx VIP
- 2016中职对口升学语文复习教案:文言文03.doc
- 全国职业院校技能大赛高职组(商务数据分析赛项)备赛试题及答案.doc VIP
- 自愈力饮食法读书札记.docx VIP
- 校准品溯源-课件.pptx
- 六年级语文上册教材解读省公开课获奖课件说课比赛一等奖课件.pptx
- 人音版五年级上册第五单元第2课时《故乡的小路》课件.pptx
- 【技能大赛】《商务数据分析》赛项赛题及答案(第5套) .pdf VIP
- 2023年人教版数学五年级上册全套练习册含答案.doc
- 《医学影像设备学》DR数字X线摄影系统.ppt
文档评论(0)