Hudson River and GE.ppt

  1. 1、本文档共33页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Hudson River and GE

Simultaneously Meeting Standards Efficient dredging of inventory with fewer cuts (productivity) leads to fewer bottom disturbances and smaller dredging releases (resuspension) and quicker certification of post-dredging concentrations (residuals) reducing duration of exposed bottom surface (resuspension). Per Residual Standard, appropriate selection of cut lines is important in minimizing re-dredging...and therefore in meeting the standards simultaneously. OVERALL BENEFITS OF PROJECT Far more PCBs in the River than estimated The River is NOT “cleaning itself” at the rate predicted by the model used in the 1990s. Sediments are not being buried.. Surface concentrations are 3x higher, and water column concentrations are 2-3 X higher, than 1990s model predicted. Both show little or no decline over a decade. Even with an increase in the resuspension standard, completion of the dredging project will confer significant and lasting benefits. More Information For information on Hudson River Dredging Project: /hudson/ For EPA’s Report on Phase 1: /Report For GE’s Report on Phase 1: / * * * * * * * Minip-scow volume= 35 cy neat. Usuable volume with 1foot freeboard for water = ~25 cy * Consider changing title to “Simultaneously Meeting Standards”…maybe shift location Need to make the point that “cut” as used here is not synonymous with “dredging pass” used for compliance with the standard. Dredging pass is defined by an operation concluding with post-dredging sampling, while “cut” is every layer removed by the dredge. GE effectively had multiple cuts per pass when they performed fine grading separated from the primary cut of the dredge pass by dredging contractor cut line verification bathymetry. This involved re-location of the dredge back to previously dredged areas prior to certification sampling. The point here is to distinguish actions bundled for the purposes of compliance verification, and actions as experienced by the river bottom. (Important to know that fine gr

文档评论(0)

l215322 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档