Hudson River and GE.pptVIP

  • 7
  • 0
  • 约 33页
  • 2017-03-29 发布于江苏
  • 举报
Hudson River and GE

Simultaneously Meeting Standards Efficient dredging of inventory with fewer cuts (productivity) leads to fewer bottom disturbances and smaller dredging releases (resuspension) and quicker certification of post-dredging concentrations (residuals) reducing duration of exposed bottom surface (resuspension). Per Residual Standard, appropriate selection of cut lines is important in minimizing re-dredging...and therefore in meeting the standards simultaneously. OVERALL BENEFITS OF PROJECT Far more PCBs in the River than estimated The River is NOT “cleaning itself” at the rate predicted by the model

文档评论(0)

1亿VIP精品文档

相关文档