- 1、本文档共33页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Hudson River and GE
Simultaneously Meeting Standards Efficient dredging of inventory with fewer cuts (productivity) leads to fewer bottom disturbances and smaller dredging releases (resuspension) and quicker certification of post-dredging concentrations (residuals) reducing duration of exposed bottom surface (resuspension). Per Residual Standard, appropriate selection of cut lines is important in minimizing re-dredging...and therefore in meeting the standards simultaneously. OVERALL BENEFITS OF PROJECT Far more PCBs in the River than estimated The River is NOT “cleaning itself” at the rate predicted by the model used in the 1990s. Sediments are not being buried.. Surface concentrations are 3x higher, and water column concentrations are 2-3 X higher, than 1990s model predicted. Both show little or no decline over a decade. Even with an increase in the resuspension standard, completion of the dredging project will confer significant and lasting benefits. More Information For information on Hudson River Dredging Project: /hudson/ For EPA’s Report on Phase 1: /Report For GE’s Report on Phase 1: / * * * * * * * Minip-scow volume= 35 cy neat. Usuable volume with 1foot freeboard for water = ~25 cy * Consider changing title to “Simultaneously Meeting Standards”…maybe shift location Need to make the point that “cut” as used here is not synonymous with “dredging pass” used for compliance with the standard. Dredging pass is defined by an operation concluding with post-dredging sampling, while “cut” is every layer removed by the dredge. GE effectively had multiple cuts per pass when they performed fine grading separated from the primary cut of the dredge pass by dredging contractor cut line verification bathymetry. This involved re-location of the dredge back to previously dredged areas prior to certification sampling. The point here is to distinguish actions bundled for the purposes of compliance verification, and actions as experienced by the river bottom. (Important to know that fine gr
您可能关注的文档
- Barack Obama.ppt
- bei Nestlé.ppt
- B2U3-Assignment & Expressions.ppt
- Bill_of_Rights.ppt
- Boethius’s Consolation of Philosophy,Book I-III.ppt
- Bonding and electromigration of 30um fine pitch.ppt
- Book11 M4U1 修改版.ppt
- Book5(unit4)language points00.ppt
- British and American Survey 英美概况问答.doc
- Britain history 1.ppt
- DB32∕T 2202-2012 北美鹅掌楸容器苗生产技术规程.docx
- DB32_T 2942-2016鲜食夏大豆 通豆9号品种.docx
- DB3210_T 1142-2023 扬州豆腐菜肴制作技艺.docx
- 鸟类追踪器使用规范_DB23T 2871-2021.docx
- DB33/T 2548-2022朱鹮人工种群构建及野化训练技术规程.docx
- DB3308T 153-2024柑橘园碳排放核算办法.docx
- DB3305_T 107-2019 营养健康村建设规范.docx
- DB3305╱T 112-2019 乡镇现代商贸建设和评价规范.docx
- DB3301 T 0393-2023 放心消费直播间管理规范.docx
- DB22T 2349-2015 无公害农产品 寒酥梨生产技术规程.docx
最近下载
- 铁塔室外光电一体箱(技术规范书)-.docx VIP
- 铂科磁材在太阳能逆变器的应用.pdf VIP
- 2025·上海浦东新区·二模智慧藏于“笨办法”:慢工出细活的真谛+审题立意及范文-备战2025年中考语文各地名校模考卷作文导写.docx VIP
- 经血源传播疾病的医院预防控制措施.docx VIP
- 安全操作规程(全套).doc VIP
- (word完整版)苏州工业园区合格证第四版参考题库答案.pdf VIP
- 2025年北京市通州区中考一模从“乐在其中”悟人生真谛”审题立意及范文-备战2025年中考语文各地名校模考卷作文导写.docx VIP
- 2021版 客户侧电能计量装置通用设计要求 第1部分 10kV用电客户电能计量装置.docx VIP
- Q∕SYCQ 4008-2022 工业用液化轻烃原料(打印版).pdf VIP
- 租房合同范本(完美打印版)6篇 .pdf VIP
文档评论(0)