GUIDANCE ON THE PRODUCTION AND COMPLETION OF SCTR AND PCTR PROFORMAS.pdf

GUIDANCE ON THE PRODUCTION AND COMPLETION OF SCTR AND PCTR PROFORMAS.pdf

  1. 1、本文档共25页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
GUIDANCE ON THE PRODUCTION AND COMPLETION OF SCTR AND PCTR PROFORMAS

European Workshop for Open Systems EWOS/ETG 043 GUIDANCE ON THE PRODUCTION AND COMPLETION OF SCTR AND PCTR PROFORMAS (Supersedes ETG016) approved by EWOS/TA (1994) European Workshop for Open Systems EWOS Secretariat: Rue de Stassart 36, 7th Floor,1050 Brussels Tel: + 32 2 511 74 55 - Fax: + 32 2 511 87 23 ? European Workshop for Open Systems 1994 - All rights reserved. No part may be reproduced or used except as authorised by contract or other written permission. The copyright and the foregoing restriction on reproduction and use extend to all media in which the information may be embodied. GUIDANCE ON THE PRODUCTION AND COMPLETION OF SCTR AND PCTR PROFORMAS Version 1. 0 July 1994 Editor : Tony HOPKINSON NCC Open Systems Oxford Road, Manchester, UK FAX : +44 61 236 9877 Phone : +44 61 228 6333 E-Mail : tony@ncc.co.uk EWOS EG CT/ETSI TC MTS joint document : EWOS ETG XXX / ETSI ETR YYY Guidance on the production completion of SCTR PCTR proformas ___________________________________________________________________________ DOCUMENT STATUS Version Date Status Draft V1.0 Draft V1.1 Draft V1.2 Draft 2.0 Draft 2.1 Version 1.0 16/4/93 13/5/93 1/6/93 10/4/94 22/5/94 12/7/94 Initial draft for review and comment by EWOS, ETSI, OSTC, ETCOM, 3-X, OIW, AOW Including EWOS EG CT comments from April 1993 meeting Including OSTC comments from METH AG meeting May 1993 Major revision to align with ISO/IEC 9646 Part 5: 14/3/94, Version 6.6 It should be noted that the ’94 edition of 9646/5 incorporates most of the proposals of V1.x editions of this document. This version also incorporates EWOS/ETSI comments of June ’93 and OIW comments of June ’93. Revision following EWOS EGCT review in April 1994 of Draft V2.0 Revision of Draft 2.1 following review and approval in joint EWOS- EGCT/ETSI -TC MTS 28/6/94. This version is for submission to AOW and OIW and is the final version for submission to EWOS TA for approval as an EWOS Technical Guide and ETSI Secretariat for publication as an ETSI Tec

文档评论(0)

l215322 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档