FSME-09-031, May, Program, 10 CFR Parts 50, 52
(FSME-09-031, May, Program, 10 CFR Parts 50, 52)
May 20, 2009
STATE LIAISON OFFICERS
PROPOSED AMENDMENTS TO 10 CFR PARTS 50 AND 52 TO ENHANCE EMERGENCY
PREPAREDNESS REGULATIONS (FSME-09-031)
Purpose: To inform the State Liaison Officers of the May 18, 2009, publication of the Nuclear
Regulatory Commission’s (NRC’s) proposed emergency preparedness regulations in Federal
Register notice (FRN), 74 FR 23254.
Contents: Draft Environmental Assessment (EA) supporting the proposed rule.
Background: The Nuclear Regulatory Commission (NRC) has published the enclosed FRN,
to amend 10 CFR 50.47, 50.54, and Appendix E to codify certain generically applicable
requirements similar to those previously imposed by Commission orders, update the emergency
preparedness regulations to include requirements previously and voluntarily initiated by nuclear
power plant licensees, and amend other licensee emergency plan requirements based on a
comprehensive review of the NRC’s emergency preparedness regulations and guidance. The
proposed requirements would enhance the ability of licensees in preparing, and taking, certain
emergency preparedness and protective measures in the event of a radiological emergency;
address, in part, security issues identified after the terrorist events of September 11, 2001; clarify
regulations to effect consistent emergency plan implementation among licensees, and modify
certain emergency preparedness requirements to be more effective and efficient. The
proposed rule is available for public comment through notice in the Federal Register and can be
accessed at /2009/pdf/E9-1094.pdf. Enclosed with this letter is
the EA supporting the proposed rule. The conclusion of the EA is the Commissions finding that
no significant environmental impact will result from the proposed rule.
Discussion: If you have any comments on the rule and its environmental assessment, please
provide them by August 3, 2009. Comments received after this date
您可能关注的文档
- DWARF27, an Iron-Containing Protein Required for the.pdf
- Dynamic characteristic of ice-shedding on UHV overhead transmission lines.pdf
- Dynamical behavior in the.pdf
- Dynamics and thermodynamics of the pseudospin-electron model in the case of absence of the.pdf
- Dynamics and freeze-out of hadron resonances at RHIC.pdf
- Dynamics of sleep-wake transitions during sleep.pdf
- Dynamics of strange, charm and high momentum hadrons in relativistic nucleus-nucleus collis.pdf
- Dynamics of the Chain of Oscillators with Long-Range Interaction From Synchronization to Ch.pdf
- Dynamic structural assessent of a highway bridge via hybrid FE model and in situ testing.pdf
- E+H电磁流量计-故障诊断.pdf
- 2025年福建省宁德市福鼎市高三下学期考前数学适应性演练(二)试题.docx
- 2025年福建省宁德市福鼎市高三下学期3月联考数学试卷.docx
- 2025年重构优势 明智成长.pptx
- 2025年重庆项目投资可行性研究.pptx
- 2025年福建省宁德市寿宁县高三下学期第八周周测数学试卷.docx
- 中国反应器热塑性聚烯烃弹性体行业市场前景预测及投资价值评估分析报.docx
- 2025年福建省宁德市寿宁县高三下学期考前数学适应性演练(二)试题.docx
- 2025年重庆消费电子精密配件项目商业计划书.pptx
- 2025年福建省宁德市寿宁县高三一模数学试卷及答案.docx
- 2025年福建省宁德市蕉城区高三英才班下学期数学限时训练试题.docx
文档评论(0)