Handout7_Non-coal Application of Room and Pillar Mining.pdf

Handout7_Non-coal Application of Room and Pillar Mining.pdf

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Handout7_Non-coal Application of Room and Pillar Mining

Non-coal Application of Room and Pillar Mining (Stope and Pillar Mining) See pages: 45-53, 159-214 of the textbook (Techniques in Underground Mining) Applications - Large, flat or nearly flat deposits (less than 30 degree dip) ? has been used for small bodies too ? in very thick deposits, pillar degradation is possible, requiring larger pillars or pillar reinforcement ? problems with very thin seams too. - competent roof and floor ? however, this could be applied to various kinds of orebodies (host rock strength between 344.7 – 27.5 Mpa and at depths from 15-915 m). Essentially, that range covers any rock that will withstand development w/o massive supports - examples of room-and-pillar mines are in lead (Buick mine, Missouri), zinc, salt, trona (Wyoming), sandstone mining, limestone Three variants - horizontal stoping of a flat deposit - stoping of an inclined deposit (between 20-30 degrees) - horizontal stoping or step mining of an inclined deposit. Development - minimum development in flat deposits - roadways for access and transport of ore - development and mining can be combined Production ? thick deposits - mined in slices. - production starts at the top and roof is bolted. Sometimes, however, some ore may be left at the top due to ? the ore may not have been known to be there. In such a case, “overhand stoping” (see below) can be used to mine the upper slice. ? the ore may be uneconomical at the present time - after a suitable advance, the bottom is excavated by benching. This method is called “underhand stoping”. ? The vertical face on the top layer is called “breast” ? Since benches are developed in a downward direction, this method is also called “underhand stoping”. ? Another variant is “overhand stoping,” where horizontal slices are taken in an upward direction. Sometimes, such as in irregular deposits, it becomes necessary to leave some ore on the floor to reach the full height of the stope. ? In underh

文档评论(0)

l215322 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档