- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Progress of the BEPCII Linac Commissioning
Pei Guoxifor the BEPCII-Linac Group
Institute of High Energy Physics
Chinese Academy of Sciences ;The Committee suggests paying particular attention to the following details in 3rdIMAC and our responses;The Committee would like to encourage the BEPC-II team to try to accommodate the full sub-harmonic bunching systems program or at least keep it as a high priority valuable upgrade option. The potential benefit may not only be the slightly increased injection efficiency but these systems may also contribute significantly to providing tolerable condition for the colliding beam detector during top-up operation.
It is planning to apply the budget, and may finish the technical design by full 2005, construction in 2006, be measured and RF conditioned in the 1st half 2007 and will be installed in the tunnel in summer 2007.
With regard to operations, the Committee would like to mention that a single spare klystron might not be sufficient to provide the high machine availability necessary for the anticipated top-up mode. The Committee suggests to re-assess the probability for system failures based on BEPC-I linac and SLAC linac operations.
It is planed to make each 45-50 MW klystron be operated at 35-40 MW output, then two spare klystron may be possible; as a back-up version, one more SLAC-65 MW klystron may be prepared to instead of one 45-50 MW klystron and keep the total 16 klystron constant.;Contents
1. Sub-systems upgrade progress
2. Machine commissioning
3. Problems;1.1 Pre-injector ;200Kv High voltage
station ;;Gun controller power supply;;
;Date;Status and plans of SHB system;Beam Dynamics Simulation:;Structure of SHB2 test cavity;Date;Date; DC solenoid;Measured Main Parameters
(2004-2005);Upgrades of all 16 units
have been completed.;50KV / 30KW charging power supply;Beam voltage / Beam current / RF output;Improved Beam Voltage Flatness with New PFN Inductor;Beam Voltage Stability;;Prototype Test Result at K9;Phase reference system;Phase and
您可能关注的文档
- 2011浙江高考语文阅卷评析.ppt
- A-C, Governance and Transparency.ppt
- 2009高中英语一轮复习教学案.doc
- Application of Mobile IP and Mobile Internet.ppt
- Comparative Health Insurance System.ppt
- Dimensional Tolerance Allocation for New Type of Parallel Machine Tools.doc
- College English Teaching and Learning.ppt
- English-Chinese Translation:Theory and Practice 英汉翻译:理论与实践.ppt
- ENGLISH TRAINING COURSE FOR MARINE ENGINEERS.ppt
- Grammatical Complexity.ppt
文档评论(0)