- 1、本文档共149页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
桂林医疗保险系统工程实施方案最新!
桂林市医疗保险系统工程实施方案
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 153
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the p
您可能关注的文档
- 某知公司为六西格玛黑带考试制作的培训教材.doc
- 某科股份有限公司项目建议书.doc
- 某电工程公司绩效考核管理体系制度规定.doc
- 某盘零件的机械加工工艺规程设计.doc
- 某典零件的逆向工程与加工制造.doc
- 某科公司现金计划薪酬方案.doc
- 某某房地产综合信息管理系统方案章.doc
- 某物公司管理方案.doc
- 某空公司绩效管理方案范本.doc
- 某矿地测管理制度汇编.doc
- JB∕T 8413.7-2015 内燃机机油泵 第7部分:总成产品可靠性考核方法.docx
- JB∕T 8126.4-2014 内燃机冷却水泵 第4部分:水封技术条件.docx
- JB∕T 8126.5-2014 内燃机冷却水泵 第5部分:水封试验方法.docx
- GB∕T 8190.5-2019 往复式内燃机 排放测量 第5部分:试验燃料.docx
- JB∕T 11878-2014 往复式大功率内燃机进、排气门技术条件.docx
- JB∕T 13052-2017 内燃机 锻钢活塞技术条件.docx
- JB∕T 11799-2014 发电用内燃机及内燃发电机组可靠性考核方法.docx
- NB∕SH∕T 0926-2016 内燃机油节能性能的评定 程序VID法.docx
- GB∕T 20651.1-2018 往复式内燃机安全 第1部分:压燃式发动机.docx
- JB∕T 13289-2017 内燃机 可变气门系统 凸轮相位调节器技术条件.docx
文档评论(0)