- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
涂料工技术交底
技术交底记录
表 C2-1编 号工程名称清华大学百年会堂校史馆(东、西区)装修工程交底日期 DATE \@ yyyy-M-d 2017-4-22日施工单位中建一局集团建设发展有限公司华昊装饰部分项工程名称涂料交底提要墙面、天棚腻子、涂料施工
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defect
您可能关注的文档
最近下载
- 畜牧兽医畜禽疾病防治题库试题库.pdf VIP
- 污水厂清淤泥施工方案.docx VIP
- 人力资源岗位招聘笔试题(某大型央企)2025年题库精析.docx VIP
- 湖南省第二届全省建设工程质量、安全监督技能竞赛-质量题库(理论部分).pdf
- 〖CJJ89-2012〗城市道路照明工程施工及验收规程.pdf VIP
- 浙江乔宇电气三相液晶多功能说明书20230808(完整版).pdf VIP
- 我国司法实务中的庭外重组及其法律表达.docx VIP
- 医疗器械购货者资格审核制度.docx VIP
- 《旅游线路设计》 项目二 旅游线路设计的内容.pptx VIP
- 中国系统性红斑狼疮诊疗指南(2025版)解读.pptx
文档评论(0)