- 1、本文档共14页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
雀巢啡FLASH广告制作
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 长沙房地产项目市场分析研究月报页.doc
- 长治民营企业协会表彰请示.doc
- 长沙一言堂文化传播有限公司简介.doc
- 长沙院琴房施工组织设计.doc
- 长治商局营业执照检网上申报流程最新版.doc
- 长白城市总体规划预测部分.doc
- 门业场分析及区域市场规划.doc
- 门封挤板培训教材.doc
- 门店务言行规范.doc
- 门店心工作开展管理制度厨房部分朕之味.doc
- 2022年2月云浮市税务系统遴选面试真题附带题目详解.docx
- 2022年2月喀什地区直机关遴选公务员面试真题带详解.docx
- 2022年2月晋城市税务系统遴选面试真题回忆版汇总.docx
- 2022年2月徐州市直机关遴选公务员面试真题附解析.docx
- 2022年2月黄南州直机关遴选公务员面试真题带详解.docx
- 2022年2月保山市税务系统遴选面试真题回忆版.docx
- 2022年2月陇南市直机关遴选公务员面试真题回忆版汇总.docx
- 2022年2月安顺市直机关遴选公务员面试真题带题目详解.docx
- 2022年2月吐鲁番地区直遴选面试真题带详细解析.docx
- 2022年2月娄底市直机关遴选公务员面试真题附带题目详解.docx
文档评论(0)