- 1、本文档共22页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
北京联合大学 毕业论文
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one
您可能关注的文档
- 版本科人才培养方案艺术学院.doc
- 物流师请记忆.doc
- 特殊教育专业本科阅读书目.doc
- 猪流感甲型HN型流感.doc
- 独立学院的可持续发展.doc
- 独立型离网型光伏系统.doc
- 王家荣宝供十大事记.doc
- 王家荣便利店的发展特征与趋势.doc
- 王家荣TPM基础资料.doc
- 王家荣世界汽车业强国地位的演变及其对我国的启示.doc
- 2024-2049武汉地铁武汉轨道交通线网规划两方案【高清原图】【最新版】.docx
- 2024-2024学校教师心理健康培训方案.docx
- 2024.01.19综11创建磁性病房活动方案总计划.docx
- 水环境富营养化控制中的生物修复技术评估与优化策略资料集.docx
- 公司差旅费报销管理制度及流程.pdf
- 基于用户行为轨迹的电商平台个性化推荐系统构建与性能分析资料集.docx
- 第章地形图的应用确定点的坐标两点间距离方位角确定点的高程.ppt
- 寒区道路冻融病害防治技术国际合作项目成果总结与转化策略研究资料集.docx
- 抗菌涂层在医疗器械表面的防腐蚀性能研究资料集.docx
- 2020门面租赁合同书精简版.docx
文档评论(0)