- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 6
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marki
您可能关注的文档
- 组织行为学复习罗宾斯版.docx
- 经典统计学与贝叶斯统计学的区别于分.doc
- 细胞生物学简答.doc
- 经理级简历模版免费直接使用.doc
- 经管暑期社会实践活动方案 doc.doc
- 经管学院关于开展大学生暑期“三下乡”社会实践活动的.doc
- 结构吊装方案 修复的.docx
- 经典文档种设计模式.docx
- 给排水设计基本程序与方法新手必看.doc
- 结直肠癌肝转移诊断和综合治疗指南V.doc
- 山西省晋城市陵川县事业单位考试《公共基础知识》试题.docx
- 辽宁公务员考试行测试题及答案.docx
- 高二课件物理(人教版2019)选择性必修2第三章31交变电流.pptx
- 数轴课件人教版数学七年级上册_1.pptx
- 等式性质与不等式性质(第一课时课件)-高一数学《知识素养思维》精讲课件(人教A版2019).pptx
- -2常见统计图的识别及应用课件-高一下学期数学人教A版.pptx
- 部编版语文二下-5雷锋叔叔你在哪里第1课时.pptx
- 切线长定理课件北师大版九年级数学下册.pptx
- 2019人教版高中英语挖掘文本深度学习必修一Unit2(学生版).docx
- Unit8SectionAGrammarFocus课件人教版(级下册.pptx
文档评论(0)