- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
盘点提高伏发电系统转换效率的几种方法
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 皮鞋油盒塑料模具设计说明书.doc
- 盐城公交C卡收费系统技术方案.doc
- 监控录像统建议方案.doc
- 盐酸标准液的标定.doc
- 监理必要和可行性.doc
- 盐水毛豆产品研究与开发.doc
- 监理签字语一览表.doc
- 盘点十大然抗癌食品 吃出健康远离癌症.docx
- 监理合同档表.doc
- 目前中国面上钙产品概况分析.doc
- 2025年综合类-世博会知识竞赛-世博会知识竞赛-旅游法知识竞赛历年真题摘选带答案(5套单选100题.docx
- 多模式镇痛课件.ppt
- 2025年新疆农业职业技术学院单招笔试职业能力测验试题库含答案解析(5套共100道单选合辑).docx
- 辽宁省葫芦岛锦化高中2026届数学高一上期末教学质量检测模拟试题含解析.doc
- 2025年综合类-船舶防火与灭火-灭火剂的种类:泡沫历年真题摘选带答案(5卷单选题100道).docx
- 第五章-频域分析---初定.pptx
- 机械设计基础课件-平面机构运动简图的绘制.pptx
- 欧洲东部和北亚和俄罗斯.pptx
- 硅材料中碳氧杂质行为.pptx
- 2025年南通师范高等专科学校单招笔试英语试题库含答案解析(5套100道合辑-单选题).docx
文档评论(0)