- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
D打印数字制造与第三次工业革命
position for future reference. Installation using special lifting pole rotor rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. shaft coupling .1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along
position for future reference. Installation using special lifting pole rotor rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before th
您可能关注的文档
- Aechzwt中国经济管理大学学员课件某企业物流部组织机构图与岗位职责描述.doc
- aknfvea中山大学微观经济学与管理学原理考研试题答案.doc
- ajdpdk会计毕业论文现行经济环境下会计计量模式的探讨.doc
- ajozgmb中国经济管理大学学员课件某企业项目部组织机构图与岗位职责描述.doc
- Akypxeaa初级经济师金融专业知识与实务练习题.doc
- Aecgrrk中国经济管理大学学员课件某企业生产部组织机构图与岗位职责描述.doc
- ajovtxa中国经济管理大学学员课件某企业物流部组织机构图与岗位职责描述.doc
- a工业设备及管道绝热工程质量的检验评定标准.doc
- Bkagiek经济师人力资源管理专业知识与实务考试大纲.doc
- bd通信信息业务员初级试卷正文.doc
- GAPCR良好农业规范认证特别规则Ver改.doc
- DYJA风冷式冷水机和LCA工业制冷恒温风冷式冷水机价格.docx
- Frizq中级经济师人力资源管理专业知识与实务真题.doc
- GSMR数字移动通信应用技术条件第三分册调度命令信息无线传送系统V.doc
- G工业产品创新设计与快速成型.doc
- HYHDA海鲜鱼池鱼缸制冷机和风冷式工业冷水机价格.docx
- justrite安全柜和工业安全柜价格.docx
- ITAT第七届全国信息技术应用水平大赛电子商务运营预赛试题客观题含答案.doc
- Kxxhi中级经济师工商管理专业知识与实务真题.doc
- Jkmmim对外经济贸易大学行政管理学考研试题,考研试题答案.doc
最近下载
- DB34_T4316-2022_皖北地区设施草莓栽培技术规程_安徽省.docx VIP
- 外研版八年级上册 Unit 3 单元测试卷答案及解析 新版 2025年新外研版八年级上册.docx
- 人教版高中数学精讲精练选择性必修二4.1 数列的概念(精练)(解析版).pdf VIP
- 输液港用无损伤针相关知识.pptx VIP
- 《尝试教学法》-公开课件.ppt VIP
- 石油化工行业安装工程预算定额说明(2019)版.docx
- 外研版八年级上册 Unit 3 单元测试卷 新版 2025年新外研版八年级上册.docx
- 2025—2026学年第一学期学校教学工作计划及序列表.doc VIP
- 高中物理电学实验专题练习(2020整理).pdf VIP
- 保洁服务管理人员安排、架构,管理方案.pdf VIP
文档评论(0)