- 1、本文档共20页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中级经济师考试房地产经济专业知识与实务考前突破卷
考中级经济师到鸭题库YaTiK做精准试题,更多押题资料下载
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre str
您可能关注的文档
- 不确定性、风险与信息.docx
- 专利信息检索专利文献信息基础版试卷一分.docx
- 下半宏观经济形势展望分析.doc
- 世界经济回顾及展望.doc
- 世界经济地理复习思考题.doc
- 世纪中国农业.doc
- 世界经济信息周刊期总第期.doc
- 东北财经大学专升本入学考试国际经济与贸易专业综合及技能课考试大纲.doc
- 东北财经大学国际经济与贸易专升本考试大纲.doc
- 东北财经大学专升本考试大纲信息管理与信息系统.doc
- 剧本杀行业报告:内容创作规范与剧本市场拓展策略.docx
- 剧本杀行业区域市场区域文化特色与市场潜力分析报告.docx
- 剧本杀行业区域市场拓展实战案例研究.docx
- 剧本杀行业区域市场拓展路径与模式探索报告.docx
- 剧本杀行业区域市场竞争态势与品牌差异化策略研究报告.docx
- 剧本杀行业2025年西北区域市场市场细分领域竞争态势与品牌竞争策略分析研究报告.docx
- 剧本杀行业2025年西北市场拓展前景预测报告.docx
- 剧本杀行业2025年长沙市场发展潜力分析报告.docx
- 剧本杀行业2025年长三角市场竞争策略与布局分析.docx
- 医疗行业数据合规:2025年数据安全法实施后的合规监管挑战与应对.docx
最近下载
- 螺杆空气压缩机排气含油量高原因分析和解决措施.pptx VIP
- GBT51121-2015 风力发电工程施工与验收规范.doc VIP
- 螺杆压缩机排气温度高原因分析.doc VIP
- 部编版(2024)道德与法治一年级下册道德与法治第二单元《我们一起长大》全单元教学课件.pptx
- 合成氨压缩机温度波动原因分析.docx VIP
- 2024年03月云南省特种设备安全检测研究院人员招考聘用编制外工作人员9人笔试历年高频考点(难、易错点荟萃)附带答案详解.docx VIP
- 学堂在线大国航母与舰载机2025秋答案.docx
- 离心式压缩机轴瓦温度波动原因探析及解决措施.pdf VIP
- TCBDA55-2021住宅室内装饰装修工程质量验收标准.pdf VIP
- T/CSPSTC 41-2019钢结构建筑施工测量及监测技术规范.pdf
文档评论(0)