- 1、本文档共38页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中级经济师考试财政税收专业知识与实务模拟真题
考中级经济师到鸭题库YaTiK做精准试题,更多押题资料下载
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre st
您可能关注的文档
- 中国人民大学工商管理硕士生入学考试试题和答案含管理学,营销管理,财务管理,信息管理.doc
- 中国农业银行员工违反规章制度处理办法知识竞赛题库.doc
- 中农大批次发展经济学作业A.doc
- 东营市经济技术指标及经济形势研判.doc
- 中国工业地产市场全景调研与投资战略报告版.doc
- 东财建设工程经济在线作业三.doc
- 中国房地产指数系统数据信息周报南京地区.doc
- 中国古代的农业及手工业.doc
- 专题工业高考+联考模拟地理试题分项版解析解析版Word版含解析.doc
- 中国汽车工业回顾一.doc
- 2025医院卫生院医德医风考评细则方案.docx
- 2025学年四川省内江市【国家公务员】公共基础知识预测试题含答案.docx
- 2025医院卫生院改进医疗服务专项行动实施方案.docx
- 2025上半年湖北省十堰市郧阳区事业单位《公共基础知识》试题及答案.docx
- 2025学年云南省昆明市国家公务员公共基础知识预测试题含答案.docx
- 2025医院公开招聘简章(模板).docx
- 2025医院卫生院采购询价管理细则(最新版).docx
- 2025医共体医院分级诊疗双向转诊实施方案.docx
- 2025深入贯彻中央八项规定精神学习教育应知应会50题题库(含答案).docx
- 2025上海社区《网格员》考前模拟题(含答案).docx
文档评论(0)