- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
分深化经济体制改革,推动发展方式转变试卷
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviati
您可能关注的文档
- 中级经济师运输经济水路专业知识与实务真题.doc
- 中级经济法考试大纲.doc
- 九级政治全册第三单元第七课关注经济发展习题精选新人教版.doc
- 中级经济法第七章随堂练习.doc
- 二级注册建筑师考试法律法规经济与施工.doc
- 中级经济师金融专业与务实备考单选练习.doc
- 二级建造工程师考试网上辅导建设工程施工管理施工信息管理.doc
- 云南初中信息技术五大模块复习资料:总结计划汇报设计可编辑.doc
- 云南农业大学学报社科版论文模板.doc
- 中级职称中级经济法试题及详解.doc
- 2022年11月连江县直机关遴选公务员面试真题带答案详解.docx
- 2022年11月遵义市直遴选面试真题回忆版.docx
- 2022年2月伊春市税务系统遴选面试真题回忆版.docx
- 2022年11月朔州市税务系统遴选面试真题回忆版汇总.docx
- 2022年2月秦皇岛市税务系统遴选面试真题回忆版汇总.docx
- 2022年2月焦作市直机关遴选公务员面试真题附详解.docx
- 2022年11月黑龙江省直机关遴选公务员面试真题附详细解析.docx
- 2022年2月潍坊市直机关遴选公务员面试真题附解析.docx
- 2022年2月大同市直遴选面试真题附详解.docx
- 2022年2月巴音郭楞蒙古自治州直机关遴选公务员面试真题带题目详解.docx
文档评论(0)