- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
发展经济学新系统作业题及答案
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +
您可能关注的文档
- 全国会计专业考试经济法基础密押试卷八.docx
- 全国经济专业技术资格考试冲刺试卷经济基础知识与实务.doc
- 全国硕士研究生入学考试英语核心词汇必备商志词汇增加单元对应信息复制.doc
- 全国经济专业技术资格考试经济基础.doc
- 全国会计专业考试经济法基础密押试卷一.docx
- 全国经济专业技术资格考试试卷人力资源管理专业知识与实务初级.doc
- 全国经济专业技术资格考试试卷经济基础.doc
- 全国经济专业技术资格考试试卷经济基础中级.doc
- 信息系统项目管理师计算分析题ME.doc
- 全国经济专业技术资格考试试卷金融专业知识与实务初级.doc
- 古镇旅游旅游与地方旅游形象塑造研究.docx
- 2025年商业银行数字化运营中用户体验监测与改进方案.docx
- 2025年共享自习室品牌认知度与用户付费意愿研究.docx
- 绿色建筑节能技术绿色债券定价影响因素与投资指南.docx
- 2025年数字乡村建设与农村文化传承与创新研究报告.docx
- 2025年社区智慧物流解决方案:智能快递柜布局运营策略深度解析.docx
- 2025年厨房用品电商仓储自动化解决方案创新案例研究报告.docx
- 农业种植2025年农业信息化基础设施建设对产量影响分析报告.docx
- 脑机接口设备医保支付政策2025年对医疗行业政策调整建议.docx
- 2025年社区老年大学线下教学点社区教育人才培养模式研究.docx
文档评论(0)