- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
合肥市新站区信息中心机房防雷及电路改造工程(1
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviati
您可能关注的文档
- 全国会计专业考试经济法基础密押试卷八.docx
- 全国经济专业技术资格考试冲刺试卷经济基础知识与实务.doc
- 全国硕士研究生入学考试英语核心词汇必备商志词汇增加单元对应信息复制.doc
- 全国经济专业技术资格考试经济基础.doc
- 全国会计专业考试经济法基础密押试卷一.docx
- 全国经济专业技术资格考试试卷人力资源管理专业知识与实务初级.doc
- 全国经济专业技术资格考试试卷经济基础.doc
- 全国经济专业技术资格考试试卷经济基础中级.doc
- 信息系统项目管理师计算分析题ME.doc
- 全国经济专业技术资格考试试卷金融专业知识与实务初级.doc
- 2025AACR十大热门靶点推荐和解读报告52页.docx
- 财务部管理报表.xlsx
- 高中物理新人教版选修3-1课件第二章恒定电流第7节闭合电路欧姆定律.ppt
- 第三单元知识梳理(课件)-三年级语文下册单元复习(部编版).pptx
- 俄罗斯知识点训练课件-七年级地理下学期人教版(2024).pptx
- 课外古诗词诵读龟虽寿-八年级语文上学期课内课件(统编版).pptx
- 高三语文二轮复习课件第七部分实用类文本阅读7.2.1.ppt
- 高考物理人教版一轮复习课件第4章第3讲圆周运动.ppt
- 高考英语一轮复习课件53Lifeinthefuture.ppt
- 2025-2030衣柜行业风险投资发展分析及投资融资策略研究报告.docx
文档评论(0)