- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
国际生物经济大会日程
position for future reference. Installation using special lifting pole rotor rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. shaft coupling .1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings alongPAGE 16
position for future reference. Installation using special lifting pole rotor rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified
您可能关注的文档
- 初级会计职称真题及答案:经济法基础.doc
- 初级会计职称经济法基础全真机考模拟试题中大网校.doc
- 初级会计职称经济法基础1.doc
- 初级会计职称经济法基础最后冲刺试题中大网校.doc
- 初级会计职称经济法基础机考模拟题.doc
- 初级会计考试经济法基础.doc
- 初级会计职称经济法基础模拟试题一.doc
- 初级会计职称经济法基础模拟答案.doc
- 初级会计职称经济法基础模拟试题一中大网校.doc
- 刘诗白政治经济学第版课后习题详解第九章社会主义市场经济体制.doc
- 2025年休闲食品健康化转型下的市场拓展策略与渠道创新报告[001].docx
- 农村电商服务站品牌建设:2025年运营模式创新与品牌传播报告.docx
- 2025年互联网金融平台合规整改与金融科技监管的合规监督与可持续发展策略.docx
- 2025年短视频平台内容监管与平台社会责任关系研究报告.docx
- 农产品溯源体系在农产品质量安全监管中的信用体系构建与实施策略研究.docx
- 2025年工业互联网平台数据备份与恢复策略创新方案探讨.docx
- 2025年线上法律咨询服务平台法律咨询行业竞争策略研究.docx
- 农业产业集群农产品流通体系构建与发展机制报告.docx
- 智能制造领航者:2025年3D打印技术在规模生产中的应用效果分析报告[001].docx
- 农村金融服务创新与农村金融消费者权益保护法规实施效果分析报告.docx
文档评论(0)