- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Detection of rock strength at Branisko massif
Acta Montanistica Slovaca Ro?ník 5 (2000), 3, 233-236
Detekcia pevnosti horninového masívu Branisko
Edita Lazarová
1
Detection of rock strength at Branisko massif
When monitoring and optimizing the driving proces of the exploratory gallery by a computer system, conditions for verification of the
interaction between desintegrating head of driving machine and rock massif were created. One of the output values of this mathematical
model is the model strength at a simple pressure σ , which is defined as a pressure at the discus and the massif contact during the
tlH
desintigration (a near limit of massif strength). By geological and geological engineering exploration, the section of length 2340 m was
divided into fourty-two geological sections and five quasi-homogeneous massif enviroments. In the article, results of scleroscopic strength
σ
the strength in a simple pressure determined from the point load test and the strength at simple pressure σ
are confronted . The main
tlH
CI ,
advance of the electronic geomechanical monitoring is the density of gained information. The two-seconds sample period of input and output
data during the driving process makes it possible to describe driving circumstances in an almost continual way for each millimeter of the
built tunnel. Then the information about changes of disintegrated rock properties, have the same density (frequency). By comparing a
quantity of data gained by examining the index of point strength, scleroscopic strength and the model strength in a simple pressure from the
monitoring process of driving process it is obvious that during the driving of exploratory gallery of motorway tunnel Branisko, a proportion
of data number from the three “type examinations” of strength was reached and it was approximately 1:7:5000. Approximately in the same
proportion, there were determined values for the 42 geologic sections (I. – XLII.), which were defined in detai
您可能关注的文档
- Desigualdades sociais e rela o com a escola.doc
- Desmoid tumor in Gardner's Syndrome presented as acute abdomen.doc
- Desmoplastic Fibroma of the Maxilla Report of a Rare Case.doc
- Dessine-moi un climat. Que penser du diagramme ombrothermique.doc
- Detecting Output Pressure Change of Positive-Displacement Pump by Phase Trajectory Method.doc
- Detection and phylogenetic analysis of Orf virus from sheep in Brazil a case report.doc
- Detection of dengue-4 virus in pune, western india after an absence of 30 years - its association with two severe cases.doc
- Detection of poliovirus by ICCqPCR in concentrated water samples has greater sensitivity and is less costly using BGM cells in suspension as compared to monolayers.doc
- Detection of porcine parvovirus using a taqman-based real-time pcr with primers and probe designed for the NS1 gene.doc
- Detection of Phytoplasma Associated with Periwinkle Virescence in Egypt.doc
- Detergent zeolite complex Alusil, Zvornik.doc
- Detergent zeolite filtration plant.doc
- Determinants of accepting unintended pregnancies by Ukrainian women Results of a 2007 survey.doc
- Determinants of contraceptive use by women of reproductive age in Ukraine, results of 1999 survey.doc
- Determination of criterion of differentiating of categories business activity of enterprise and market activity of enterprise.doc
- Determination of Culture Condition for Polygalacturonase Production by Rhizoctonia solani AG2-2, Causal Agent of Root Rot in Sugar Beet.doc
最近下载
- 基坑支护内支撑梁拆除施工方案.docx VIP
- 最新人教版一年级上册《数学游戏》课件(整套)教学PPT(2024年秋-新教材).pptx VIP
- 最新人教版一年级数学上册《数学游戏》教学课件(整套)PPT(2024秋-新教材).pptx VIP
- GBT6058-2005 纤维缠绕压力容器制备和内压试验方法.pdf
- GB╱T 23711.1-2009 氟塑料衬里压力容器电火花试验方法.pdf
- 7m焦炉推焦车的结构特征.pdf
- 研发领料单模板.docx VIP
- 辽宁省技工学校审批表.doc VIP
- GB 26501--2011 氟塑料衬里压力容器 通用技术条件.pdf
- 施工放样报验单.doc VIP
文档评论(0)