Procalcitonin to guide duration of antibiotic therapy in intensive care patients a randomized prospective controlled trial 英文参考文献.docVIP
- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Procalcitonin to guide duration of antibiotic therapy in intensive care patients a randomized prospective controlled trial 英文参考文献
Available online /content/13/3/R83
Research
Open Access
Vol 13 No 3
Procalcitonin to guide duration of antibiotic therapy in intensive
care patients: a randomized prospective controlled trial
Marcel Hochreiter1, Thomas K?hler1, Anna Maria Schweiger2, Fritz Sixtus Keck2,3, Berthold Bein4,
Tilman von Spiegel1 and Stefan Schroeder1
1Department of Anesthesiology and Intensive Care Medicine, West Coast Hospital, Esmarchstrasse 50, 25746 Heide, Germany
2Department of Laboratory Medicine and Clinical Chemistry, West Coast Hospital, Esmarchstrasse 50, 25746 Heide, Germany
3Medical Clinic, West Coast Hospital, Esmarchstr. 50, 25746 Heide, Germany
4Department of Anesthesiology and Intensive Care Medicine, University Hospital Schleswig-Holstein, Campus Kiel, Schwanenweg 21, 24105 Kiel,
Germany
Corresponding author: Stefan Schroeder, sschroeder@wkk-hei.de
Received: 24 Feb 2009 Revisions requested: 18 Mar 2009 Revisions received: 21 Mar 2009 Accepted: 3 Jun 2009 Published: 3 Jun 2009
Critical Care 2009, 13:R83 (doi:10.1186/cc7903)
This article is online at: /content/13/3/R83
? 2009 Hochreiter et al.; licensee BioMed Central Ltd.
This is an open access article distributed under the terms of the Creative Commons Attribution License (/licenses/by/2.0),
which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Abstract
Introduction The development of resistance by bacterial
species is a compelling issue to reconsider indications and
administration of antibiotic treatment. Adequate indications and
duration of therapy are particularly important for the use of highly
potent substances in the intensive care setting. Until recently, no
laboratory marker has been available to differentiate bacterial
infection from viral or non-infectious inflammatory reaction;
however, over the past years, procalcitonin (PCT) is the first
among a large array of inflammatory variables that offe
您可能关注的文档
- Priority Setting for Pandemic Influenza An Analysis of National Preparedness Plans 英文参考文献.doc
- Prioritizing Emerging Zoonoses in The Netherlands 英文参考文献.doc
- Priority Medicines for Maternal and Child Health A Global Survey of National Essential Medicines Lists 英文参考文献.doc
- Prioritizing Investment in Medical Education 英文参考文献.doc
- Priority actions to fight antibiotic resistance results of an international meeting 英文参考文献.doc
- Priority setting of health interventions the need for multi-criteria decision analysis 英文参考文献.doc
- Pristimerin, a Triterpenoid, Inhibits Tumor Angiogenesis by Targeting VEGFR2 Activation 英文参考文献.doc
- Pristine Early Eocene Wood Buried Deeply in Kimberlite from Northern Canada 英文参考文献.doc
- Privacy-Preserved Behavior Analysis and Fall Detection by an Infrared Ceiling Sensor Network 英文参考文献.doc
- Private and Public Decisions in Social Dilemmas Evidence from Children’s Behavior 英文参考文献.doc
最近下载
- 统编版六年级语文上册习作《多彩的活动》精品课件(共84张PPT).pptx VIP
- 电厂2×600MW机组扩建工程建筑及安装工程土建专业主要技术施工方案.docx VIP
- 电厂2×600MW扩建(脱硫土建、安装)工程土建专业主要施工技术方案.docx VIP
- 电厂2×600MW机组扩建工程建筑及安装锅炉专业施工技术方案.docx VIP
- 煤电公司2×600MW机组工程汽机专业主要施工技术方案.pdf VIP
- 2X660MW超超临界燃煤机组工程qtz2500型塔式起重机安装的施工方案.doc VIP
- 2X660MW超超临界燃煤机组工程#2锅炉平台楼梯安装方案全案(终版).doc VIP
- 2X660MW超超临界燃煤机组工程#2锅炉平台楼梯安装的方案.doc VIP
- 电厂(2×660MW超超临界机组)机组安装工程锅炉专业施工方案.docx VIP
- 电厂(2×660MW超超临界机组)机组安装工程汽机专业施工方案.docx VIP
文档评论(0)