- 1、本文档共96页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程管理专业英语教程
Unit 1 The Importance of Management in Civil Engineering Lesson 1 Emerging Role of Management in Civil Engineering 1. Why are managerial skills highly demanded in civil engineering? Because civil engineering firms have grown substantially in staff size, disciplines, and geographic areas served, so these conditions have created a demand for civil engineers with special skills in project management. 2. What are the main subjects one should learn in order to get MPM (Master’s in Project Management)? It includes subjects as: 1. Financial issues for engineers 2. Bargaining and negotiations 3. Human resources management 4. Project scheduling 5. Accounting issues for engineers 6. Engineering law 3. Why is it necessary to provide a local manager? What kind of qualities should he possess? When the projects are based in remote locations, particularly overseas, and when the client requires the design to be carried out locally, it becomes necessary to provide a project manager possessing not only well-honed engineering skills and good judgment, but other skills in contract management, such as those needed to negotiate changes in project scope and duration . Lesson 2 The Construction Industry What is construction? Why is the construction of projects so complicated? Construction is essentially a service industry, whose responsibility is to convert the plans and specifications prepared by an engineer or an architect into a finished project. The construction of projects involves thousands of details and complex interrelationships among owners, architects, engineers, general contractors, speciality contractors, manufacturers, material dealers, equipment distributors, governmental bodies and agencies, labor, and others What should designers and constructors do in order to cooperate with each other harmoniously? The designer must be in close contact with everything that is done during the construction work so that any changes in the site conditions, materials and work being done
您可能关注的文档
- 小提琴教学方案.doc
- 小学音乐第十一册教案.doc
- 小数点搬家 (小学数学 讲课教案 PPT课件).ppt
- 小样本资料的差异显著性检验.ppt
- 小王侃健康-营养素蛋白质.ppt
- 小猫钓鱼+小羊过桥+猴子与螃蟹.ppt
- 小班幼儿分享行为研究结题报告.doc
- 小熊温尼菩.doc
- 小户型研究报告.ppt
- 小班科学活动:电话真有趣.doc
- 专题08 特殊平行四边形计算与证明(测试)-2024年中考数学冲刺复习讲练测(浙江新中考)(解析版).pdf
- 2025年泰山职业技术学院高职单招职业技能考试近5年备考题库及答案解析.docx
- 2025年咸阳职业技术学院高职单招职业技能考试近5年备考题库及答案解析.docx
- 2025年广东碧桂园职业学院高职单招综合素质考试近5年备考题库及答案解析.docx
- 2025年河北司法警官职业学院高职单招职业技能考试近5年备考题库及答案解析.docx
- 2025年湖南艺术职业学院高职单招综合素质考试近5年备考题库及答案解析.docx
- 专题11《与妻书》-2024年高考语文课内文言文挖空训练+知识梳理+过关训练(统编版)(解析版).pdf
- 拒收红包培训课件.pptx
- 2025年湘南幼儿师范高等专科学校高职单招职业技能考试近5年备考题库及答案解析.docx
- 2025年陕西财经职业技术学院高职单招职业技能考试近5年备考题库及答案解析.docx
文档评论(0)