《桥梁工程》温习题_选择题和揣摸改错题1(国外英文资料).docVIP

《桥梁工程》温习题_选择题和揣摸改错题1(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
《桥梁工程》温习题_选择题和揣摸改错题1(国外英文资料)

《桥梁工程》复习题_选择题和判断改错题1(国外英文资料) Bridge project. Applicable class: 1 ~ 2 class in 1 grade 1 traffic Using textbooks: yao lingsens bridge project (second edition) A, multiple choice The basic composition of the bridge consists of the upper structure, the lower structure and ___C_____ A. ground b. bridge c. taper slope d. base The high water level of the design of the bridge is called __D_____. A. the water level is at the highest level 3. The two adjacent beam bridge pier horizontal distance between center line, or between center line of pier and abutment back front machine horizontal distance, called ___D_____ A. the cross diameter c. the standard cross-diameter d. calculate the cross-diameter The distance between the two side walls of the bridge and the rear end of the wall is called ___C___. A. bridge span b. bridge C. the bridge is full of D The length of the bridge is (C). A. the distance between the front and back of the bridge The distance between the two points of the bridge C. The distance between the ends of the two Bridges of the bridge D. The sum of the net span of each hole The height of the bridge is (A). The height difference between the bridge and the bridge The difference between the bridge and the bottom of the pier The difference between the deck and the ground D. The difference between the deck and the foundation Bridges are divided into ___A_____ by system. A. bridge, arch bridge, rigid frame bridge, cable bearing system bridge and composite system bridge B. the bridge of the beam bridge, the cantilever bridge, the continuous girder bridge and the continuous rigid frame bridge C. wooden bridge, steel bridge, masonry bridge, reinforced concrete bridge and prestressed concrete bridge D. road bridge, railway bridge, pedestrian bridge and agricultural bridge The main difference between the beam bridge and the arch bridge is ___C____. Under vertical load, the bridge has horizontal and horizontal force Under vertical load, the bridge has horizontal and ho

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档