- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
生产计划与控制(国外英文资料)
生产计划与控制(国外英文资料)
Production management
Pre-order: the interval between the time of delivery and receipt.
Group technology: ~ parts family ~ similar manufacturing attribute or design attribute ~ reduce adjustment preparation time, accelerate the production of parts.
3. The layout of the production facilities, reasonable arrangement of each production enterprise or an organization unit and the relative position and area of auxiliary facilities, workshop layout of the internal production equipment.
4. According to the product of the production process: ~ for products or services provided by the object, according to the requirements of production products or providing services, organization of the corresponding production equipment or facilities, form the continuous production = like flowing water production line.
Inventory control system: control order points, order quantity to meet external demand and minimize total inventory cost.
Production flexibility: changes in user requirements; Market change-variety flexible, production flexibility
Inventory: a resource that is temporarily idle to meet future needs.
8. Process design: it is to point to in accordance with the requirements of product design, arrangement or planning out the raw materials processed into a series of products needed, time consuming, processing equipment and process equipment requirements, etc.
According to the manufacturing process of the processing route, the processing procedure is based on... = process specialization form.
10. Work measurement: under the condition of certain standard determination, determine the time needed for activities, people and time to develop a standard or norm of a scientific management method.
11. Production and operations management: is the design of production operation system, operation and maintenance management of the process, it includes to plan, organize and control the production and operation activities.
Fine production: low utilization of resources and high utili
文档评论(0)