明确目标 重点凸起(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
明确目标 重点凸起(国外英文资料)

明确目标 重点突出(国外英文资料) Clear the focus of your goals Strong management and implementation To six months, the engineering department in Xia Zulun in charge of the leadership and company leaders at all levels of guidance and support, combined with the actual situation of the company this year and group general requirements, the engineering department is the year of the job set a goal, focused, strong management, grasp the implementation. In the first half of June (1 -) work with engineering department is mainly from the following aspects: safety management, quality management, good faith w * * ered comprehensive evaluation, safe and civilized construction, to create excellence, method, comprehensive treatment, five with the aspects of work. We will now report on the working condition. Safety and quality management Safety and quality management are the normal work of the engineering department: The documents such as 8, 9, 10, 11, 16, 19, 20, 35 and 41 were issued in the following year. Mainly related to five implemented, the good faith evaluation, safety protection, civilized construction measures, two, w * * ered merit, rewards and punishments report, emergency rescue, and require the project department strictly implemented, do a good job of the site safety and quality management. 2, security check safety hidden dangers rectification notice 20, find out potential safety hazard of more than 180, 175 rectification, ZhengGaiLv 97%. Quality inspection has been made in 37, and the quality risk is 37, and the rectification rate is 95 percent. The quality of the safety penalty was 9,3230 yuan in January and June. The project shall be followed by the requirements of the engineering department, and after the preliminary examination, the company shall be required to sign the approval of the companys requirements for signature. Personnel management, the division of responsibilities of the department personnel, the specific scope of work. 6, project management, the engineering depa

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档