卷板工艺(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
卷板工艺(国外英文资料)

卷板工艺(国外英文资料) Ganjiang diqiao steel tower manufacturing in jishui county Process of plate roll plate DQ399 - GY - 01 To compile review audit China railway jiuqiao engineering co., LTD In March 2001 preface News in the paper of ganjiang bridge steel tower elliptic arc suppression method for outsourcing, specific pressure arc operation process and test requirement with reference to the China railway bridge engineering co., LTD. Nine volumes of enterprise standard 2 process. First, a test will be done before the relevant department is qualified to test the test pressure. One. Engineering profiles 1. The project profile Ji water gan second bridge project from news in ganjiang west city planning glorious west avenue, pile number K0 + 050, across the river and the binjiang road (green) lake avenue, JiYang road in the east end check Yu Wanli avenue, pile number K1 + 800. The route is about 1.75 km long, with 1.31 km of bridge and 0.44 km of connection. The main tower is the structure of the vertical independent two-box, the tower is above the platform above 90m, above the bridge level 67.064 m, the height of the bridge is 22.936 m. Pillar height direction points three section, pile caps is above 0 ~ 39.5 m for the concrete pillar, pile caps is above 39.5 ~ 44.2 m pillar for the steel mix segment, pile caps is above 44.2 ~ 90 m pillar for steel structure. The upper tower and the steel mix are 3.5 m for the length of the bridge. The top of the tower is 3m, the largest of which is 9.6 m. The outer contour line is used in the two sections of the arc of tangential arc. Figure 1-1 bridge layout The steel tower column is divided into 19 sections in the height direction, and the 0 # segment is a steel mix segment with a length of 4.7 m. Section 1 ~ 18 # section is the steel structure segment, the longest segment is 2.6 m, the shortest segment is 1.854 m. FIG. 1-3 steel tower column and elevation drawing 1-4 steel tower The project content: including steel pillar (including pillar s

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档