- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
沉降观测记录表C3-1-4主厂房(国外英文资料)
沉降观测记录表C3-1-4主厂房(国外英文资料)
Table C3-1-4
The sink and fall view record
Construction unit: Shanxi Province industrial equipment installation company ShouYang power plant project department from the August 20, 2012 to September 23, 2012, no. :
The name of the project
Shouyang 2 x 15 mw biomass direct combustion generation project
Oxygen between
Observation point
The observation date
The measured elevation
(m)
This settlement
(mm)
The total settlement
(mm)
Loading situation
Level position and number
3 #)
1.
2012.08.20
0.295
3.97 m layer casting
The bench mark elevation
- 2.380 m
2.
0.278
Level model
DSZ2
3.
0.320
The observation point layout diagram:
See the attached:
(4)
0.300
5.
0.294
6.
0.363
1.
2012.09.22
0.295
0
0
6.97 m layer casting
2.
0.277
one
one
3.
0.320
0
0
(4)
0.297
3
3
5.
0.292
2
2
6.
0.360
3
3
Unit of measure (official seal), head of technology: quality inspector: observer: supervision engineer: on September 23, 2012
The attached:
Table C3-1-4
The sink and fall view record
Construction unit: industrial equipment installation company ShouYang power plant projects in Shanxi Province from September 23, 2012 to 2012 on November 8 check number:
The name of the project
Shouyang 2 x 15 mw biomass direct combustion generation project
Oxygen between
Observation point
The observation date
The measured elevation
(m)
This settlement
(mm)
The total settlement
(mm)
Loading situation
Level position and number
3 #)
1.
2012.10.28
0.294
one
one
12.47 m layer casting
The bench mark elevation
- 2.380 m
2.
0.277
0
one
Level model
DSZ2
3.
0.319
one
one
The observation point layout diagram:
See the attached:
(4)
0.296
one
4
5.
0.286
6
8
6.
0.355
5
8
1.
2012.11.8
0.292
2
3
16.74 m layer casting
2.
0.275
2
3
3.
0.317
2
3
(4)
0.296
0
4
5.
0.286
0
8
6.
0.355
0
8
Unit of measure (official seal), head of technology: quality inspector: observer: supervision engineer: on November 8, 2012
The sink and fall view record
Construction unit: Shanxi Province industrial equipment installation co
您可能关注的文档
最近下载
- 泌尿外科管道护理规范PPT.pptx VIP
- 2025年人工智能AI安全报告.pdf VIP
- 日立电梯保养手册HGE-ELS05.pdf VIP
- 2023年山东省监理人员业务中级水平考试试题质量 .pdf VIP
- HGE系列电梯安装调试手册(ELS05系统SW00004269,A.4 ).docx VIP
- 贵州初级建筑工程师考试题库.doc VIP
- 丹徒经济开发区复配绿色产业园转型升级改造项目环评报告书.pdf VIP
- (高清版)DB3302∕T 209-2024 水肥一体化智能灌溉系统运行维护规范.pdf VIP
- 第五课 我国的根本政治制度 高中政治课件.pptx VIP
- 2025年中国宠物行业白皮书.docx
文档评论(0)