- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
第三章 网络计划技术(国外英文资料)
第三章 网络计划技术(国外英文资料)
Chapter 3 technologies for network planning
Advantages of network diagrams
It is a comprehensive and comprehensive way of expressing the priorities of the work and the interplay between the work
The relationship between the covenant and interdependence;
2, the calculation of various time parameters;
In the various and intricate plans, the key task of determining the progress of the project is to be found, and the main spear is easy to grasp
Shield, ensure the construction period, avoid blindly construction;
Being able to choose the optimal plan from many possible solutions;
In the course of the execution of the plan, a certain task may be foreseen for a delay or in advance
It has an impact on the overall plan, and can be adjusted quickly to ensure that it is self-regulated
To control and supervise the plan effectively;
Use the time reserves of the various tasks reflected in the network plan to better allocate manpower and material resources
The goal of reducing costs;
Its emergence and development enabled the modern computing tool, the electronic computer, to be managed in the construction plan management
Applications.
Of § 3-2 network diagram
The double code network diagram
The double code network diagram consists of three basic elements of work, node and line.
Work (also called process, activity, process)
A job is a subproject or subtask that consumes time or consumes resources in a way that requires a degree of detail. It is one of the elements of the network diagram, which is represented by an arrow and two circles. Work the name of the annotation at the top of the arrow line working duration with under the line of the arrow, the arrow line arrows are the beginning of the said work, end node arrow node indicates the end of the work. The names of the two Numbers in the circle represents the work, because it is two to say a work, therefore, called double code representation, composed of double code representation network diagram is called double