- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
表一 旬阳县2009年元至6月重点项目建设进度一览表(国外英文资料)
表一 旬阳县2009年元至6月重点项目建设进度一览表(国外英文资料)
Table 1 xunyang county in 2009 yuan to June key project construction progress schedule
Single digit
The serial number
The project name
The construction of
category
Construction target
Hanging together
leadership
Package catch department
Packages to catch those responsible
The project schedule
There is a problem and
The next step is to work
one
Xunyang coal-fired power plant *
In the early
work
Complete the research and supporting documentation.
Chen Wuwen
Projects agency (darpa)
Deng Bangcai
Preparing and reviewing the feasibility study report and entering the closing stage; Most of the provincial supporting documents have been achieved.
Accelerate project progress and get approval as soon as possible.
2
Annual production of 100,000 tons alloy production line *
In the early
work
Complete the feasibility study.
Jun-jie zou
Projects agency (darpa)
Deng Bangcai
Completed the project proposal.
Actively attract investment
3
The annual production of 100, 000 tons metal magnesium production line *
In the early
work
Complete the feasibility study.
Brian chan
Projects agency (darpa)
Deng Bangcai
Completed the project proposal.
Actively attract investment
4
Annual production of 1.2 million tons of pellets,
600,000 tons of sponge iron production line *
In the early
work
Complete the project proposal.
Chen Changxue
Right belongs to the
Yang feng
A feasibility report is being written.
We need to start the previous review work
5
Annual production of 100,000 tons of zinc smelting production line
In the early
work
Complete approval, strive to start construction, complete investment 100 million yuan.
Once chaoyang
Federation of industry and commerce
OuYangHe
There is only the eia procedure, the municipal environmental protection bureaus pre-trial opinion, the total emission index, and the eia report are all in place. It has been reported to the environmental protection agency of the ministry of environmental protection and has been accepted.
Active
您可能关注的文档
最近下载
- 江铜产融2025年度社会招聘笔试历年参考题库附带答案详解.docx
- 销售管理(第6版)建立销售渠道.ppt VIP
- 1.2《大数的认识大数的读法与写法》(教学课件)四年级数学上册北京版.pptx
- 2022十八项医疗核心制度之会诊制度培训(精华版).ppt VIP
- 基于BIM的EPC项目管理应用研究.pdf VIP
- 法说西游记(湖南大学)中国大学MOOC慕课章节测验答案(课程ID:1205730816).pdf VIP
- 2024年医师麻精药品处方权暨药师调剂资格考核试题.docx VIP
- 质量管理小组活动推进指南(TCAQ10208-2024).docx
- 飞机防冰排雨系统.ppt VIP
- 深静脉血栓形成的诊断和治疗指南(第三版)解读PPT课件.pptx VIP
文档评论(0)