- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
路灯工程(国外英文资料)
路灯工程(国外英文资料)
Section 19. Streetlamp engineering
One, process flow
Measuring lofting to foundation pit excavation, pouring the street lamp base - laying cable - insulation test to street lamp installation, electrical equipment installation to test, debug, self-checking and completion inspection and acceptance
Second, construction method
1, foundation construction,
Using artificial cooperate with excavator in foundation pit excavation, when dig to 10 cm away from the design elevation, using artificial nap, lest overbreak, foundation pit size must comply with the design requirements. After testing qualified for anchor bolt installation of foundation pit, the anchor bolt installation location must be accurate, and strictly control the elevation, the top level for the kerbstone crest elevation + 20 cm control, pouring concrete to embedding double PVC trunking, at the same time. Concrete pouring must be done on the whole basis once, and it is strictly forbidden to water the base graded intermittently. USES the commercial concrete, concrete construction process, the laboratory must be strictly controlled for raw materials, firmly wiped out unqualified concrete, concrete casting vibrating to fully, cant leak.
Cable: meet the following requirements
(1) the cable model is yjv-1kv-5 * 25/yjv-1kv-3 * 25, which is buried in the buried floor of the p63, which is not less than 70cm.
(2) the fixed, spacing and bending radius of the cable shall conform to the regulations;
(3) the cable joints are good and the insulation should meet the requirements.
(4) when the cable is laid, the length of the cable shall be no less than 10cm of fine earth or sand, and the length of the cable shall be covered by the cable protection plate.
(5) the cable shall be protected by the DN100 galvanized steel pipe, and the cable connection well shall be set at both ends of the pipe and the cable joints.
Lamp installation regulation
(1) the lamp installation height (from the light source to the floor), the